BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Corliss High School - Door #9 Replacement Provide Labor and Materials: Demolish and replace door number 9. 1) Remove the existing pair of doors, transom, framing and existing hardware. 2) Dispose of old hardware on site at the building's dumpster. 3) Measure, prepare existing opening for installation of the following: One (1) Pair of Doors - 72" x 90" Opening with 1" Tempered Glass -22"x 36" Two (2) Aluminum Continuous Hinge Door Prep One (1) Von Duprin Exit Only Device One (1) Von Duprin Exit Device with Night Latch Trim One (1) Von Duprin Keyed Removable Mullion - Less Cylinder Two (2) Recessed Pull Handles Vandal Screen for the doors only Door Closers Threshold 4) Contractor to secure necessary permits. 5) Contractor to field verify dimensions and specifics of all projects listed above before placing a bid. 6) Not responsible for contractor errors as a result of non-field verification. 7) Materials and installation must comply with CPS Standards and Specifications as listed on a) SECTION 08 11 13 HOLLOW METAL DOORS AND FRAMES b) SECTION 08 71 00 DOOR HARDWARE 8) Secure job site overnight if work is not completed in one day. 9) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 10) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 11) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 12) Contractor is to remove and dispose of materials torn out and any construction debris. 13) All trash must be removed off-site by contractor. 14) Clean the surrounding area and make sure all is swept of debris. 15) All questions/requests must be received two (2) business days prior to bid closing. The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. Warranty information, when applicable, shall also be included & submitted. All work to be performed during normal working hours. If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid.

Bid Results

Educational

$49,567.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
92
Bidding Soon
1,774
All Active Projects
778
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 5, 2023

November 6, 2023

img_map_placeholder

821 E 103rd St, Chicago, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.