BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a transportation facility in Sacramento, California. Completed plans call for the renovation of a transportation facility.

The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County. Question Submission Deadline:October 16, 2023, 2:00pm Direct pre-bid questions to the Project Manager, Kevin Wallace, via the Q&A tab in the portal Kevin Wallace Building Trades Coordinator Email: wallacek@saccounty.gov The work to be performed under this contract includes the furnishing of all labor, materials, equipment, and and other incidental work for: Remove and discard existing carpet and replace with new carpet There are 2 areas in the Airport Customs and Border Patrol (CBP) areas that need carpet and base replaced. 1. Ag Inspection Area Approximately 475 SQ YDS 2. Passport Inspection Area Approximately 1312 SQ YDS All measurements shall be field verified. o Remove existing carpet and wall base, (base where applicable) and dispose of. o Existing carpet is 36" X 36"squares o Furnish and install New Carpet: Mannington Mills. Model: Coast 34924 6E (18" X 36") o Furnish and install new 4" black base and transition strips where needed/applicable o This work includes floor prep and all materials needed, adhesive o All work will be on the secure side of the Airport. An escort will be provided o All day Parking will be limited to two work trucks on the secure side

Award

Transportation Terminals

$98,484.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
80
Bidding Soon
1,424
All Active Projects
603
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

November 27, 2023

img_map_placeholder

6851 Lindbergh Dr, Sacramento, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.