Site work and paving for a road / highway in Mukilteo, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project Description This project will resurface the existing pavement of 47th Place W (federal grant) and 106th Street SW (nonparticipating) with HMA from Harbour Pointe Boulevard to 47th Ave W, approximately 0.42 and 0.18 linear miles respectively. The road sections are two-lane roadways, with a typical roadway width ranging between 31 to 36 feet. This project may also evaluate and repair deeper structural section distress prior to the HMA overlay. Existing roadway pavement markings will be replaced, and utility lids (sewer, water, gas) are expected to be adjusted to grade. In addition, the project will retrofit existing curb ramps and add a new RRFB crosswalk that will comply with current ADA requirements It is anticipated that the environmental documentation under NEPA will be Categorical Exclusion (CE). Acquisition of Temporary Construction Easements may be necessary. Scope of Work The Scope of Work will include, at a minimum, the following elements: 1. Project Management 2. Public Outreach (Optional) 3. Site Assessment o Pavement Evaluation and Design 4. Environmental Permitting and Documentation 5. Right of Way - Temporary Construction Easements (if required) 6. Engineering and Design o Surveying and Base mapping o Utility and WSDOT Coordination o Plans Specifications & Estimate with review at 60% and 90% o Final Construction Documents 7. Ad Ready Documents & Bidding Support 8. Construction Management & Inspection (Optional) The above scope lists optional services and services if required that are included in the selection process. The City may choose to contract with the Consultant for optional phases or scope at the discretion of the City that are listed above. The selected firm will need to have the resources that will enable it to complete tasks quickly and be extremely responsive. The firm will need to be able to accomplish this work independent of City staff support, other than oversight by the City's project manager. The City's project manager will lead the overall process and will be the nexus through which all public involvement and agency coordination occurs. The City of Mukilteo reserves the right to reject any and all responses to this RFQ and to waive any informality in the interests of the City. To clarify, it is not our intent for you to create an elaborate SOQ. Please keep submittals to seven (7) 85x11 (letter) size pages, or less, one (1) 11x17 page may be substituted for one 8.5x11 page. Selection Process A committee of City personnel will evaluate and rate the proposals using the following criteria: 1. Can meet the short design timeline to meet construction obligation deadline of June 1st. 2. Experience of Project Manager/Team Leader 3. Demonstrated ability to keep projects on time and within budget 4. Responsiveness and effectiveness 5. Project team experience with pavement overlay projects; 6. Project team experience with federally funded projects; 7. Project team member qualifications; 8. Environmental Permitting and Documentation 9. Familiarity with FHWA standards and the WSDOT LAG Manual; 10. Ability to apply creative solutions to complicated projects and the approach to this project; and, 11. Demonstrated ability to communicate and work effectively with the public, City staff, and regulatory agencies. Inquiries Direct all inquiries regarding this request for qualifications to Gael Fisk, City Engineer at 425.263.8080 or Luke Thornton, Capital Projects Manager at 425.263.8086.

Post-Bid

Roads / Highways

$5,500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
91
Active Projects
49
Bidding Soon
909
All Active Projects
341
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2023

December 19, 2023

img_map_placeholder

47th Pl W, Mukilteo, WA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.