BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a fire / police facility in Atlantic Beach, North Carolina. Completed plans call for the renovation of a fire / police facility.

scope of the work is, but not limited to as follows: 1. General Construction - Roof Overbuild 2. Plumbing System 3. HVAC System 4. Electrical work 5. All related work. A. General: All allowances considered in the Contract Price shall be clearly identified in the Contract and approved before signing. If the actual cost is more than, or less than the allowance, the Contract Price will be adjusted up or down accordingly when the actual cost is determined. Adjustments in the Allowances will be made by Change Order. Unless specified otherwise, the allowance amounts include the net cost of materials, and shipping charges. B. Cash Allowance: The Contractor's overhead, profit and taxes shall be included in the Contract Price, but not in the allowance. All allowances agreed upon shall clearly indicate materials only or materials and labor included as the case may be. For allowance listed as materials only, the Contractor shall include labor and installation in his base bid price. The contractor shall submit to the Architect for approval all bills for materials under Cash Allowances. The Contractor shall, unless otherwise specified, supply all labor, transportation, materials, apparatus, fuel, water, energy, light and tools necessary for entire, proper and substantial completion of his work and shall install, maintain, and remove all equipment for the construction, other utensils or things and shall be responsible for the safe, proper and lawful construction, maintenance and use of same and shall construct in the best and most workmanlike manner a complete structure and everything properly incidental thereto as shown on plans, stated in specifications or reasonably implied there from, all in accordance with the Contract Documents. Scope of Work - scope of the work is, but not limited to as follows: 1. General Construction - Roof Overbuild 2. Plumbing System 3. HVAC System 4. Electrical work 5. All related work

Award

Fire / Police

$544,000.00

Public - City

Renovation

12

8

2

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
16
Bidding Soon
286
All Active Projects
111
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2023

November 30, 2023

img_map_placeholder

314 Salter Path Rd, Atlantic Beach, NC

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.