Renovation of a mixed-use development in Reno, Nevada. Completed plans call for the renovation of a medical facility.
Design Build Central Utilities Plant - Reno NV -- Y1NB Design Build Central Utilities Plant - Reno NV Scope of Work - Replace Seismically Deficient Boiler Plant, Building 8 The contractor will provide all labor, material, and equipment necessary to complete a final project design along with complete physical construction necessary to deliver a new Central Utility Plant (CUP) at the VA Sierra Nevada Health Care System (VASNHCS) in Reno, Nevada. The project scope includes associated work activities consisting of, but not limited to, improvements at an existing gravel park lot, demolition of the facility's current utility building, the Boiler Plant, Building 8, conversion of the Boiler Plant location into a parking lot, and installation of a bulk oxygen storage room with associated tanks and equipment. More specifically, the contractor will design, construct and achieve the following activities in listed order; 1) improvements to an existing gravel parking lot to pave, stripe, drain and light the lot for the facility's use during project duration. The lot will also include an emergency call system which matches that in other similar lots at the facility. 2) build an approximately 11,000 GSF CUP structure housing the boilers, chillers, cooling towers, and the bulk oxygen system to provide steam, heating and cooling for the entire VASNHCS campus. Additionally, as the current facility main power feed runs through the courtyard of the existing Boiler Plant, the project will also include all electrical work required to relocate the electrical service from the present location to a new location within the CUP. 3) thoroughly test all equipment and systems in the CUP to assure complete functionality of the systems and equipment. Once testing has been completed and accepted by the VA, make final connection of all utility systems to existing utility feeds on the east side of Kirman Avenue at the location where the utility feeds currently exit the Boiler Plant. 4) demolish the existing Boiler Plant once the CUP is fully operational and providing all utility services to the facility. This scope all includes removal of hazardous materials prior to demolition of the building. 5) convert the Boiler Plant location, once demolition is complete, into a paved, striped surface level parking lot, including lighting and proper drainage. 6) re-stripe the lot improved per item 1 above to meet VA criteria for the proper allocation of standard and handicap stalls. For informational purposes only and to provide prospective offerors with a greater understanding of the Government's requirements, accompanying this RFP solicitation are the following documents: (1) conceptual drawings indicating project siting, phasing, and preliminary design; (2) narratives describing technical approach to the project; and (3) supporting design specifications and documents. Note this preliminary design information is provided for information only. The Design Build Contractor selected for this project is under no obligation to incorporate this conceptual design information into their final project design. The contractor will provide all required professional design services within all required disciplines necessary to complete the above referenced scope. All disciplines shall have a current professional license issued by the State of Nevada or equivalent document from another state. Although a geotechnical report is being provided, the contractor will be responsible for completing their own geotechnical analysis as part of project design development. All construction activities will be accomplished by firms which have a current license issued by the Nevada State Contractors Board or equivalent document from another state . All design documents are to be developed in accordance with the VA Technical Design Library, which can be accessed at https://www.cfm.va.gov/til/. The final design and construction of the project will fully incorporate the requirements listed in the referenced site. No deviations will be allowed unless prior approval is provided by the VA Contracting Officer. Project No - 654 - 212 Project Title - Replace Seismically Deficient Boiler Plant, Building 8 Project Location - VA, VISN 21, VA Sierra Nevada Health Care System VASNVHCS, Reno, NV, 89502. This is a TWO-PHASE DESIGN-BUILD ACQUISITION issued in accordance with FAR Subpart 36.3. All qualified Offerors highly encouraged to submit for Phase I. After Phase I evaluation completion, selected Phase II Offerors will be notified with instructions for Phase II submission. Follow all instruction starting from the INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS page. This is a Design-Build project, the project magnitude is between 20,000,000 and 50,000,000. The approved NAICS Code is 236220 and Small Business Size Standard is 45 Million. This Design-Build project is being solicited as a 100 percent SDVOSB pursuant to the set-aside authority contained in 13 CFR 125 and FAR Part 19. If award cannot be made, the solicitation will be cancelled, and the requirement resolicited. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Medical
$50,000,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 29, 2024
December 31, 2024
975 Kirman Ave, Reno, NV
Related To This Project
Reno, NV
--
Reno, NV
Bid Date: Nov 02 2023
Reno, NV
Bid Date: Oct 13 2023
Reno, NV
Bid Date: Nov 28 2023
Reno, NV
Bid Date: Nov 09 2023
Reno, NV
Bid Date: Feb 01 2024
Reno, NV
Bid Date: Nov 13 2023
Reno, NV
Bid Date: Nov 01 2023
Reno, NV
Bid Date: Oct 17 2023
Reno, NV
Bid Date: Oct 18 2023
Reno, NV
Bid Date: Nov 15 2023
Reno, NV
Bid Date: Oct 12 2023
Reno, NV
Bid Date: Aug 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.