BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Orlando, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Question Deadline 10/16/2023 at 5:00 PM ET The question and answer module of ProcureNow OpenGov IS being utilized for this solicitation. Respondents are instructed not to contact the initiating division directly. Untimely questions are unable to be submitted in the question and answer module, thereafter respondents raising critical concerns must email rolando.melo@ocfl.net. Critical clarifications may be made via addenda, however, untimely questions may not be considered. The question and answer module of ProcureNow OpenGov IS being utilized for this solicitation. Timely questions concerning this solicitation shall be submitted in accordance with the deadline for questions: Monday, October 16, 2023 at 5:00 pm EST. Respondents are instructed not to contact the initiating division directly. Untimely questions are unable to be submitted in the question and answer module, thereafter respondents raising critical concerns must email rolando.melo@ocfl.net. Critical clarifications may be made via addenda, however, untimely questions may not be considered. A Bid, Payment and Performance Bond are a requirement when the offer/contract amount exceeds $100,000. Respondents shall attach an electronic copy of their bid bond for responsiveness. Submission of the bid bond, along with a certified and effectively dated copy of the power of attorney, shall be completed and signed by all required parties and submitted on the form provided in the solicitation. Submittal of a bid bond less than 10% of the total estimated contract amount for base period, shall result in the bid being deemed non-responsive. The Board of County Commissioners, in its sole discretion, reserves the right to reject any and all bids and to waive any informality concerning bid proposals whenever such rejection or waiver is in the best interest of the County CONCRETE SIDEWALKS, 4 INCH THICKNESS Construction of 4-inch concrete sidewalk and 6-inch concrete driveway shall conform to the FDOT Standard Specifications for Road & Bridge Construction and FDOT Standard except as modified below. Foundation Foundation material shall meet the specified densities and shall be saturated but free of standing water just prior to placing concrete. Contraction Joints Contraction joints shall be sawed. All joints shall be straight lines oriented at 90 degrees to the edge of sidewalk, radially if in a curve, or as directed otherwise. The minimum depth of joints shall be 1 1/2 inches or 1/4 the nominal thickness of concrete placed, whichever is greater. Joint installation shall proceed in the same direction and sequence as the concrete placement. Sawing shall begin as soon as the concrete has hardened to the degree that excessive raveling will not occur and before uncontrolled cracking begins. Every third transverse joint and all longitudinal joints shall be sawcut within 8 hours after finishing. Remaining transverse joints, shall be sawcut within 24 hours of placement. Construction Joints Construction joints shall be constructed at the end of all pours and at other locations where the concrete placement operations are stopped for as long as 30 minutes. They shall be placed at least 10 feet from any other transverse construction joint or end of pavement section. Metal keyways shall be installed at all construction joints in driveway crossings 6-inches and greater in thickness. Concrete thickness shall be increased by 2-inches for a minimum distance of 6- inches either side of construction joints. Curing Concrete shall be cured as provided in Section 520-8, except as modified herein or as approved by the Engineer. The Contractor shall ensure enough resources are available to meet the curing requirements. If using curing compound, follow the manufacturer's recommendations. Alternate methods may be used when preapproved by the Engineer. Equipment shall be maintained as necessary to ensure a uniform application of compound. Apply additional coats of compound when directed by the Engineer. Storage containers having greater than a five gallon capacity may be utilized only with prior approval of the Engineer. The Contractor shall submit the manufacturer's literature describing

Award

Sidewalks / Parking Lot

$783,856.00

Public - County

Paving, Site Work

52

5

3

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
55
Bidding Soon
1,314
All Active Projects
543
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 31, 2023

December 1, 2023

img_map_placeholder

37th St, Orlando, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.