EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 29, 2023 at 7:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Doylestown, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

This Project Will Involve the Construction of Approximately 1 Mile of 9-10 Wide Shared Use Path Along Burpee Road, North Shady Retreat Road and Limekiln Road (Sr 4007) in Doylestown Township. Structure Mounted Barrier Will Be Added to the Limekiln Road Bridge Over Pa Route 611 to Provide a Protected Area Across the Structure. Signal Modifications and Crossing Improvements Will Be Completed at the Intersections of Burpee Road and West State Street as Well as Limekiln Road and Hospital Road. New Crossings Will Be Added at the East Butler Ave and Burpee Road Intersection, as Well as the Intersections of North Shady Retreat Road With Chestnut Valley Drive and Old Colonial Drive. Ada Ramps Will Be Designed at All Crossings Within the Project Limits and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 0000, Section Srt, in Bucks County, Doylestown Township From Approximately Sr 4202 at Segment 0121 Offset 1000 to Sr 4007 at Segment 0020 Offset 1077. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 21.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes Prequalified Subs as Prime: No State Type of Work: Transportation Alternative Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Shady Retreat SRTS Trail *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$2,594,595.00

Public - State/Provincial

Paving, Site Work

129

11

6

7

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting, Plants, Trees
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
469
Active Projects
277
Bidding Soon
4,296
All Active Projects
1,975
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

January 29, 2024

img_map_placeholder

Multiple Locations, Doylestown, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Shady Retreat SRTS Trail

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.