BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Ankeny, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

SE Delaware Avenue and SE 54th Street Traffic Signal Est. Value: $ 625,446.00 The SE Delaware Avenue and SE 54th Street Traffic Signal project includes installing a traffic signal at the intersection, installing conduit and fiber optic cable to the next intersections to the north and south, constructing an apron for a future east leg to the edge of existing right-of-way, constructing sidewalk modifications for ADA compliance, installing pavement markings, and constructing median nose modifications. The construction improvements include constructing a new traffic signal, approximately 480 SY of 10.5" thick PCC Class C-SUD street pavement, 110 SY of 5" thick PCC sidewalk, 60 SY of 6" thick PCC sidewalk, with Class 10 excavation, subgrade preparation, modified subbase, pavement markings, installing 6,680 LF of fiber optic cable, 3,630 LF of 2" conduit for fiber optic cable, fiber optic equipment and splices, temporary traffic control, erosion control, completing final surface restoration, and miscellaneous associated work necessary to complete the project. The Contractor shall substantially complete the overall project within sixty (60) working days. Substantial completion for the overall project shall be defined as all utility, grading, pavement, and traffic signal construction completed, with the new pavement markings, and the new streets, driveways, and sidewalks fully open to traffic and the new traffic signal fully operational. Should the Contractor fail to substantially complete the work in this timeframe, liquidated damages of One Thousand Dollars ($1,000.00) per calendar day will be assessed for work not substantially completed within the designated Contract term(s). The Contractor shall fully complete the overall project within ten (10) working days commencing on a mutually agreed upon date following substantial completion of the overall project. Full completion for the overall project shall be defined as all work including surface restoration and punch list items completed, and all improvements ready for final acceptance. Should the Contractor fail to fully complete the work in this timeframe, liquidated damages of Five Hundred ($500.00) per calendar day will be assessed for work not fully completed within the designated Contract term(s).

Award

Roads / Highways

$436,109.00

Public - City

Paving, Site Work

24

5

10

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
45
Bidding Soon
472
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.