BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Land O Lakes, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of November 20, 2023 this project was awarded to Kelkland Improvements with the awarded amount of $130,785.95 Town of Plum Lake will be accepting bids for road repairs for a portion of Nixon Lake Road in Star Lake, which will include ditching and gravel work. Project is to be completed by June 1, 2024. The Town of Plum Lake reserves the right to accept or reject any and all bids. This project is contingent upon the Town receiving funding from the Wisconsin Department of Natural Resources. The Town of Plum Lake reserves the right to accept or reject any and all bids. This project is contingent upon the Town receiving funding from the Wisconsin Department of Natural Resources. The primary items of work under this contract consists of stripping shoulders, removing rocks, constructing ditches with breaker run stone, installing ditch check flumes, and furnishing and placing crushed aggregate base course. The work shall be executed under the requirements of the State of Wisconsin, Department of Transportation, Standard Specifications for Road and Bridge Construction, Edition of 2020, and according to the current year State of Wisconsin supplemental specifications and the special provision specifications attached. The Town is responsible for locating and relocating property boundaries and right of way. The Town is responsible for moving or relocating utilities if required. The contractor is responsible for contacting Diggers Hotline. Crushed aggregate base course shall meet current WISDOT %", 1-1/4", or 1996 WISDOT Grade 2 specifications. Gravel if measured by the cubic yard will be based upon truck measure, or by the ton if specified. FINAL GRADING- When final grading the roadway the contractor is required to add water to the existing base course to bring roadway to optimum moisture content. It is required that the roadway be compacted with a vibratory roller. It is required that the contractor review the roads and work to be completed with a Town Representative prior to bidding, so both parties have a clear understanding of the work to be completed under this proposal. PROJECT START AT STATION 98+80 WHICH IS LOCATED 9,880' WEST OF THE NIXON LAKE ROAD AND CAMP 2 ROAD INTERSECTION. PROJECT END IS AT 188+56

Award

Roads / Highways

$130,786.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
6
Bidding Soon
88
All Active Projects
35
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 19, 2023

November 20, 2023

img_map_placeholder

Nixon Lake Rd, Land O Lakes, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.