Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an office development in Hampton, Virginia. Completed plans call for the renovation of a office development.
The project is generally described as the replacement of the HVAC for a 10,614 SF, 2 story, masonry wall, historic office building. Any bid (including the Total Base Bid plus all Additive Bid Items) which exceeds five hundred thousand dollars ($500,000) shall be accompanied by a Commonwealth of Virginia Standard Bid Bond, Form CO-10.2, payable to the Owner as obligee in an amount equal to five percent (5%) of the amount of the bid (the "Bid Bond"). The Owner agrees to accept a Bid Bond on which the Surety has utilized electronic signatures and/or electronic notarization if the electronic notarization meets the requirements of Virginia Code 47.1-6.1, -7, and -12, and the Commonwealth of Virginia State Corporation Commission Bureau of Insurance and the Bid Bond contains any SURETY BOND SEAL ADDENDUM established by the Commonwealth of Virginia State Corporation Commission Bureau of Insurance. For construction contracts in excess of $100,000 but less than $500,000, where bid bond requirements have been waived by Owner as stated in the IFB, prospective Contractors shall be prequalified in accordance with Code of Virginia 2.2-4317. A Bid Bond may be required for Contracts having bids of less than five hundred thousand dollars ($500,000) if such requirement is stated in the IFB. The Bid Bond must be issued by a surety company which is legally authorized by the Virginia State Corporation Commission to do surety business in the Commonwealth of Virginia. Such Bid Bond shall guarantee the following: that the bidder will not withdraw its bid during the thirty (30) day period following the date of the opening of bids; that if the bid is accepted, the bidder will enter into the Contract with the Owner described in the IFB; that the bidder can and will submit a properly executed and authorized Standard Performance Bond and Standard Labor and Material Payment Bond on the forms included in the IFB. If the bidder withdraws its bid within the thirty (day) period following bid opening, fails to enter into the Contract, or fails to provide the required Standard Performance Bond and Standard Labor and Material Payment Bond within ten (10) days after the bidder's receipt of notice of acceptance of its bid, the bidder and the bidder's surety shall be jointly and severally be liable to the Owner for the difference between the amount specified in the bidder's bid and such larger amount for which the Owner may contract with another party to perform the work covered by said bid, up to the amount of the bid guarantee of 5% of the bidder's total bid amount, as the damage to the Owner resulting from the bidder's default. See Code of Virginia 2.2-4336. Bid Results Lum Sum Price for all work complete and in accordance with the plans and specifications but excluding work in additive bid items - Comfort System of Virginia Inc - $1,060,160 Lum sum price for all work to demolish and remove abondoned concrete pads located in the basement complete in accordance with the drawings and specifications - Comfort System of Virginia Inc - $3,808 Lum sum price for all work to demolish and remove abondoned piping and ductwork from the basement complete in accordance with the drawings and specifications - Comfort System of Virginia Inc - $28,155
Award
Office
$1,060,160.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 10, 2024
July 10, 2024
3 Ruckman Rd, Hampton, VA
Related To This Project
Hampton, VA
Bid Date: Oct 24 2023
Hampton, VA
--
Hampton, VA
Bid Date: Oct 31 2023
Hampton, VA
Bid Date: Oct 27 2023
Hampton, VA
Bid Date: Nov 09 2023
Hampton, VA
--
Hampton, VA
--
Hampton, VA
--
Hampton, VA
Bid Date: Oct 31 2023
Hampton, VA
--
Hampton, VA
Bid Date: Dec 17 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.