BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Effingham, Illinois. Completed plans call for site work for a water / sewer project.

The work generally consists of installation of a new sanitary sewer and manholes for the City of Effingham. The proposed sanitary sewer is being installed to extend the existing sewer on the north side of Interstates 57/70, east of the termini of Ford Avenue. The extension will be west along the existing Ford Avenue ROW and or Easements. Additional considerations shall be as detailed and described in the plans and specifications titled "City of Effingham Phase II - Ford Avenue Sanitary Sewer Extension" prepared by Farnsworth Group, Inc. Provided the Contractor furnishes proof of proper insurance and bonding in a timely manner, it is anticipated that a Notice of Award of contract will be issued within 30-to-60 days of the date bids are opened and that a Notice to Proceed will be issued within 10 days of the date of the Notice of Award. This Project shall reach Substantial Completion by May 15, 2024, and Final Completion by May 30, 2024. Completion dates and requirements are further outlined in the Agreement, document C-520. Each proposal shall contain the name of every person or firm interested in the same and shall be accompanied by bid bond, certified check, bank draft, or cashier's check payable to the order of the Treasurer, City of Effingham, in an amount not less than 5% of the proposal. The City of Effingham reserves the right to reject any or all bids, waive or not waive any informality in the bids, and to accept any bid which it deems most favorable to the City. It is agreed that this bid may not be withdrawn for a period of 45 days from opening thereof or it will be subject to forfeit the 5% Bid Bond provided with the bid. It is anticipated that a Notice of Award of a contract will be issued within 30-to-60 days of the date bids are received and that a Notice to Proceed will be issued within 10 days of the date of the Notice of Award if contractor provides proper insurance and bonding in a timely manner. Work on this project is subject to the Prevailing Wage Act (820 ILCS 130/1-12). Prevailing Wages, as determined by the Illinois Department of Labor and the current Prevailing wage ordinance approved by the City Council, shall be paid. The contractor is required for submitting all certified payrolls for the awarded project and for any subcontractor work to the IDOL website pursuant to Public Act 100-1177. Work on this project is subject to the Illinois Substance Abuse Prevention on Public Works Project Act (820 ILCS 265) as enacted by P.A. 95-0635. Pre-bid Conference There will not be a pre-bid conference for this Project. Instructions to Bidders. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Bid Results

Water / Sewer

$124,396.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
43
Bidding Soon
415
All Active Projects
173
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2023

November 30, 2023

img_map_placeholder

Ford Ave, Effingham, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.