BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 27, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a civil project in Tyler, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.

This project shall consist of furnishing all necessary materials, machinery, equipment, superintendence, and labor for the Paving and Drainage Improvements to CR 3344 (From CR 336 to S.H. 155) for Smith County, Texas. Smith County reserves the right to accept or reject in whole or in part any bid received and to waive any irregularities or formalities in the best interest of Smith County. A Bid Bond is required for this project. Question Deadline 10/19/2023 at 5:00 PM CT Any prospective bidder desiring any explanation or interpretation of the solicitation must make a written request. The request must be addressed to Jaye Latch, County Purchasing Director and emailed to purchasing@smith-county.com. The improvements for this project shall consist of the following work items and/or categories. This description may not include all the work items that are required for this project, whether the items are paid or subsidiary to pertinent items. The project provides for the construction of a new 30-ft. wide county road (Length = 8346 feet), with 40-ft. wide intersection flares, with cement treated subgrade, HMAC base, and HMAC surface, and the installation of storm sewer and drainage crossing structures, installation of utility casings at crossings, with pavement markings, and all necessary appurtenances. The project also includes the installation of a deceleration lane along SH 155 with cement treated subgrade, HMAC base, one course surface treatment, and HMAC surface. The project is located on a new alignment which will allow the road to be closed to public access during the construction of the project. The construction of the deceleration lane along SH 155 will require a traffic control plan and traffic to be maintained throughout the duration of the project. The construction of the intersection at CR 336 and the I-20 Frontage Road will require a traffic control plan and traffic to be maintained, except during critical work items. Closure of the I-20 Frontage Road roadway for critical work items shall be allowed but limited as much as possible. Contractor shall notify affected property owners prior to such closures. Final cleanup of all work areas shall be made prior to final acceptance of the project. Prospective Bidders are expected to inspect the site of work and to inform themselves regarding all local conditions.

Award

Roads / Highways

$4,800,270.00

Public - City

Paving, Site Work

108

8

2

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
41
Bidding Soon
993
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

November 27, 2023

Project location map

CR 3344, Tyler, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.