Renovation of an educational facility in Rockford, Illinois. Completed plans call for the renovation of a educational facility.
The Rock Valley College chilled water loop glycol project consists of draining the existing system and replacing the current water with a mixture of water and propylene glycol. The system will require 7500 gallons of Propylene glycol 98% glycol with a 2% inhibitor. The current chilled water system at Rock Valley College is approximately 22,000 gallons total. The awarded contractor will be responsible for all supply the define glycol and all related materials to convert RVC's existing system to a 35 percent glycol mixture. The awarded contractor is responsible for delivery of material to Rock Valley College main campus located at 3301 N Mulford Road, Rockford IL 61114. Rock Valley College reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. QUESTIONS: Must be submitted no later than October 9, 2023 at 5 pm via email to Karen Kerr at k.kerr@rockvalleycollege.edu o Material Procurement: o 7,500 gallons of Propylene glycol with a composition of 98% glycol and 2% inhibitor. o Total Volume: o The chilled water loop system has a total volume of approximately 22,000 gallons. o Responsibilities of the Awarded Contractor: o The contractor is responsible for purchasing all material and delivering the required glycol material to Rock Valley College located at 3301 N Mulford, Rockford IL 61114. o Overseeing any pumps, pump trucks or other equipment needed for safe and efficient delivery of the glycol into the RVC chilled water system. o Installing all materials, which would include the mixing of the glycol with water. o Ensuring that the glycol-water mixture in the system reaches a concentration of 35% glycol or can withstand temperatures as low as -30F. o Coordination with RVC personnel as described in the bid. o To ensure installation is conducted in a safe manner. Any spill of glycol during the installation process will be the responsibility of the awarded contractor. Should a spill result in the need for additional glycol to ensure RVC has received 7,500 gallons shall be the responsibility of the awarded contractor. o Contractor is responsible to have all the necessary insurance requirements listed in the bid documents. o Contractor is responsible to comply with all State, Local, and Federal regulations for this project, this includes but is not limited to the following: State and Federal EPA regulations. OSHA regulations. State and Local laws, ordinances or other regulations. o RVC Responsibilities: o Coordination with the boiler house is crucial for running pumps and opening valves at the right time to integrate the glycol mixture into the chilled water 14 | P a g e loop system. RVC will provide three personnel to assist in completion of this project. o RVC will also provide any water that needs to be added to the RVC chilled water system. o Purging Air and Testing: o The contractor shall work with Boiler House personnel and inspect each building listed below to ensure the system is thoroughly purged of all to ensure proper operation. Classroom building Two: 2 pumps Educational Resource Center: 4 pumps Woodward Technology Center: 2 pumps Student Center: 2 pumps Physical Education Center: 5 pumps Boiler House: 7 pumps o Comprehensive testing of the system should be conducted to verify its performance and stability. This test will consist of checking all blow down values to ensure air is removed and checking approximately 22 pumps o Project Timeline: o The project must be completed no later than November 3, 2023, with the possibility of finishing earlier if feasible. o Required Mixture Ration o The mixture ratio for the entire RVC chilled water system should be 35% glycol or 30 below 0. The glycol shall contain 2 percent inhibitor. The contractor is responsible to work with RVC Boiler House personnel to ensure the proper mixture ratio is achieved. The BEP Goals for this project are as follows: The aspirational goal is to award thirty percent (30%) of the total dollar amount of any contract resulting from this bid. Rock Valley College is a comprehensive two-year community college in Rockford, Illinois, offering more than 100 courses for transfer, career programs, and certificates. Rock Valley College is accredited by The Higher Learning Commission and is a member of the North Central Association of Colleges and Schools. Rock Valley College is also recognized by the Illinois Board of Higher Education and by the Illinois Community College Board. Objective Rock Valley College is seeking bids from contractors to provide 7500 gallons of Propylene glycol, 98 percent glycol with a 2 percent inhibitor. The Rock Valley College chilled water loop glycol project consists of draining the existing system and replacing the current water with a mixture of water and propylene glycol. The system will require 7500 gallons of Propylene glycol 98% glycol with a 2% inhibitor. The current chilled water system at Rock Valley College is approximately 22,000 gallons total. The awarded contractor will be responsible for supplying the define glycol and all related materials to convert RVC's existing system to a 35 percent glycol mixture. The awarded contractor is responsible for delivery of material to Rock Valley College main campus located at 3301 N Mulford Road, Rockford IL 61114.
Award
Educational
$52,703.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 13, 2023
October 27, 2023
3301 N Mulford Rd, Rockford, IL
Related To This Project
Rockford, IL
Bid Date: Oct 19 2023
Rockford, IL
Bid Date: Oct 18 2023
Rockford, IL
Bid Date: Nov 06 2023
Rockford, IL
Bid Date: May 08 2019
Rockford, IL
--
Rockford, IL
Bid Date: Nov 17 2023
Rockford, IL
Bid Date: Nov 17 2023
Rockford, IL
Bid Date: Nov 08 2023
Rockford, IL
Bid Date: Oct 25 2023
Rockford, IL
Bid Date: Oct 26 2023
Rockford, IL
Bid Date: Nov 02 2023
Rockford, IL
Bid Date: Oct 17 2023
Rockford, IL
Bid Date: Oct 23 2023
Rockford, IL
Bid Date: Oct 18 2023
Rockford, IL
Bid Date: Jul 06 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.