BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Cheyenne, Wyoming. Contact the soliciting agency for additional information.

The Cheyenne Regional Airport has experienced growth and has generated interest in numerous aeronautical as well as non-aeronautical firms interested in providing service or leasing space. The master plan will analyze current (and forecast future) demand and develop a plan to support the needs of the Cheyenne Regional Airport over the next 20 years. The Airport Master Plan document and accompanying Airport Layout Plan will be prepared in accordance with current Federal regulations, policy, Advisory Circulars (ACs) and guidance, including: FAA Airports Standard Operating Procedure (SOP) Standard Procedure for FAA Review and Approval of Airport Layout Plans (ALPs) (ARP SOP 2.00) FAA Standard Operating Procedure (SOP) for FAA Review of Airport Property Inventory Maps AC 150/5070-6B, Airport Master Plans AC 150/5300-13B, Airport Design AC 150/5060-5, Airport Capacity and Delay AC 150/5325-4B, Runway Length Requirements for Airport Design 14 CFR Part 77, Safe, Efficient Use, and Preservation of the Navigable Airspace FAA Order 5100.38D, AIP Handbook FAA Order 1050.1F, Environmental Impacts: Policies and Procedures FAA Order 5050.4B, NEPA Implementing Instructions for Airport Actions, and FAA Environmental Desk Reference. Both the Major Tasks and the Objectives and Focus Areas for the Master Plan will be finalized after the consultant selection and in consultation with that same selected consultant. The FAA and Wyoming Department of Aviation must approve the final Scope of Work. RFQ Questions Due: October 20, 2023 by 2:00 PM Questions-All questions related to this RFQ must be in writing and received by the Cheyenne Regional Airport, no later than the due date. Questions can be delivered via e-mail to: Kmalacina@cheyenneairport.com Questions MUST be clearly marked in the subject line: "Questions, Airport Master Plan RFQ #2023-4" *MAILED, PHONE CALL AND FAXED QUESTIONS WILL NOT BE ACCEPTED RFQ Questions & Answers Publish Date: October 24, 2023 by 2:00 PM Answers- If any questions are received; answers to all written questions will be issued in the form of an addendum. The method of Contractor Selection has not been Determined at this time.

Conceptual

Transportation Terminals

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
19
Bidding Soon
345
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2024

img_map_placeholder

4020 Airport Pkwy W, Cheyenne, WY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.