BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 17, 2024 at 8:00 PM

Updated July 18, 2024

Site work, paving and outdoor lighting for a mixed-use development in Allen, Texas. Conceptual plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The bond calls for improvements to Ford Park, including installation and development of athletic fields and sports courts. This project is part of the city’s bond that was approved by voters. As of July 17, 2024, it is currently unknown if an architect, construction manager, and general contractor have been contracted with the school district. Further details regarding design and construction timelines have not been released.

Conceptual

Playgrounds / Parks / Athletic Fields

$17,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
418
Active Projects
236
Bidding Soon
4,018
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.