BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Tucker, Georgia. Conceptual plans call for the renovation of a educational facility.

As of January 3, 2024, information regarding an award for this solicitation is not available. At this time, it is not known if an award has been made. Closed solicitation has been included below for reference. ……………….. Ashford Park Elementary The Ashford Park Elementary School campus is located on 7.2 acres at 2968 Cravenridge Dr, Atlanta, GA 30319. The original campus construction was completed in 1955 with an addition in 1960. A gymnasium building was constructed in 2000. The current size is approximately 49,726 SF. At a minimum the project should meet the DCSD Elementary School Educational Specifications (Appendix C), and the DCSD Design Guidelines for Facility Construction, (Appendix D). International Student Center at Midway The International Student Center campus is located on 10.8 acres at 3318 Midway Rd, Decatur, GA 30032. The original campus construction was completed in 1958 with additions in 1966, and 1998. A gymnasium building was constructed in 1998. The current size is approximately 71,300 SF. At a minimum the project should meet the DCSD Elementary School Educational Specifications (Appendix C), and the DCSD Design Guidelines for Facility Construction, (Appendix D). GENERAL SCOPE OF WORK Ashford Park Elementary School The anticipated scope of this project is to include but is not limited to the design of the following: Replacement of HVAC system throughout the building. Replacement of doors and door hardware throughout the building. Electrical upgrades Replacement of ceilings Window Replacement Replace light fixtures with LED fixtures. Security Vestibule Fire Alarm system replacement Fire Sprinkler System Improve site storm drainage. Miscellaneous flooring replacement and painting. International Student Center at Midway The anticipated scope of this project is to include but is not limited to the design of the following: Replacement of HVAC system throughout the building. Replacement of doors and door hardware throughout the building. Electrical upgrades Replacement of ceilings Replace light fixtures with LED fixtures. Security Vestibule Fire Sprinkler System Fire Alarm system replacement Miscellaneous flooring replacement and painting. The Stated Cost Limitation (SCL) and estimated construction budget for Ashford Park Elementary School is $10,000,000 DCSD has determined that the stipulated fee the Architect will receive for this project scope will be 6% of the Stated Cost Limitation for a maximum fee of $600,000. This fee is all inclusive and incorporates all reimbursable expenses for this project and is subject to adjustments based on the final guaranteed maximum price. The Stated Cost Limitation (SCL) and estimated construction budget for International Student Center at Midway project is $15,000,000 DCSD has determined that the stipulated fee the Architect will receive for this project scope will be 6% of the Stated Cost Limitation for a maximum fee of $900,000. This fee is all inclusive and incorporates all reimbursable expenses for this project and is subject to adjustments based on the final guaranteed maximum price. Final Questions Due October 25, 2023 2:00 PM dcsd-op-bidquestion@dekalbschoolsga.org Final Addendum November 1, 2023 2:00 PM Public Acknowledgement November 13, 2023 5:00 PM Shortlist Finalist Notified (If Interviews are Conducted) N/A Public Notice of Short List will be posted to the DCSD website by close of business Anticipated Board Review and Approval January 8, 2024 Anticipated Notice of Award February 22, 2024 Anticipated Notice to Proceed March 1, 2024 The method of Contractor Selection has not been Determined at this time.

Conceptual

Educational

$25,000,000.00

Public - County

Renovation

6

11

8

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
56
Bidding Soon
1,524
All Active Projects
541
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 3, 2025

img_map_placeholder

Multiple Locations, Tucker, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.