Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Fort Thomas, Kentucky. Completed plans call for site work for a water / sewer project.
Question Deadline 10/21/2023 Questions received less than 72 hours prior to the date for opening of Bids may not be answered. The person submitting questions shall be responsible for their prompt delivery. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Steel Fencing and Installation - Fort Thomas Treatment Plant South Reservoir The proposed work is generally described as follows: The furnishing and installation of 2330 linear feet of steel fencing at the South Reservoir of the Fort Thomas Treatment Plant, 700 Alexandria Pike, Fort Thomas, Kentucky 41075. The Work covered in this section includes furnishing of all labor, materials, and equipment for the installation of six gates and a new welded ornamental steel fence system defined herein approximately 2330 linear feet around the Northern Kentucky Water District's ("NKWD") Fort Thomas Treatment Plant ("FTTP") South Reservoir. Contractor shall: A. Prepare surface to receive fencing installation. B. Provide all labor, equipment, and materials to install the new fence Products over the properly prepared surface in accordance with these Technical Specifications. C. Follow all Manufacturer published details for the Products, including but not limited to performing all steps required to avoid negating/voiding the manufacturer's warranty on the Products. 1.02 RELATED WORK This section intentionally left blank. 1.03 SYSTEM DESCRIPTION A. The manufacturer shall supply a total fence system for the following Ameristar / Assa Abloy manufactured products ("Products") at the specified quantities: 1. Montage Plus - Ornamental Steel Fence - 3-Rail Panels - 4" Air Gap - Standard Bottom - 8' Panel Length (92" actual width) - 19 pickets per panel sized .75"sq x 18ga - rails sized at 1.4375"w x 1.5"h x 14ga. Option Selection: 5' Majestic Style - 69 lbs, Majestic fence style, Black color option. Quantity: 2330 linear feet. 2. Montage Plus - Single Swing Gates - 1.75"sq x 14ga Steel Gate ends - 1.4375" x 1.5" x 14ga Rails - .75"sq x 18ga Pickets - 3.5' nominal gate opening, 40" leaf width from outside to outside. Quantity: 5. Option Selection: Heavy Commercial Hinge Kit option - 1.25" hinge clearance (x2), 3" latch clearance, and 44.25" gate post spacing. Quantity: 5 3. Montage Plus- Double Swing Gate - 12' nominal gate opening, 68" leaf width from outside to outside. Quantity: 1. Option Selection: Industrial Hinge Kit option - 1.75"sq x 14ga Steel Gate Ends - 1.4375" x 1.5" x 14ga Rails - .75"sq x 18ga Pickets - 1.25" hinge clearance (x2), 3" latch clearance, and 141.5" gate post spacing. Quantity: as required based on fence footage. Note: one main gate post shall be easily removable and replaceable to allow for gate opening to be greater than 12' when needed. 4. Montage Plus - Steel Square Posts (for core-drilled fence lines) - 2" square x 16ga - 8' post length, Black color option. Standard black flat post caps. Quantity: as required based on fence footage. 5. Montage Plus - Steel Square Posts (for core-drilled fence post) - 3" square x 16ga - 8' post length, Black color option. Standard black flat post caps. Quantity: as required based on fence footage.
Award
Water / Sewer
$175,550.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 24, 2023
November 23, 2023
700 Alexandria Pike, Fort Thomas, KY
Related To This Project
Fort Thomas, KY
Bid Date: Oct 19 2023
Fort Thomas, KY
Bid Date: Nov 09 2023
Fort Thomas, KY
Bid Date: Jan 26 2024
Fort Thomas, KY
Bid Date: Mar 27 2024
Fort Thomas, KY
Bid Date: Mar 28 2024
Fort Thomas, KY
Bid Date: Apr 18 2024
Fort Thomas, KY
Bid Date: May 02 2024
Fort Thomas, KY
Bid Date: May 02 2024
Fort Thomas, KY
Bid Date: Sep 21 2023
Fort Thomas, KY
Bid Date: Sep 06 2022
Fort Thomas, KY
Bid Date: Jan 12 2022
Fort Thomas, KY
Bid Date: Nov 23 2021
Fort Thomas, KY
Bid Date: Sep 22 2023
Fort Thomas, KY
Bid Date: Sep 14 2023
Fort Thomas, KY
Bid Date: Feb 20 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.