Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Dana Point, California. Completed plans call for site work for a water / sewer project.
The proposed Los Monteros Drive Recycled Watermain Replacement Project includes the remove and replace approximately 1,300 linear feet of 6-inch ACP with new 6-inch C900 PVC pressure pipe, install trenchless pipe liner system on approximately 340 feet of existing 6-inch ACP, connect new pipelines to existing pipelines, perform pavement removal and replacement, and pavement grind and overlay. Questions and requests for substitution pertaining to this project must be submitted to the District electronically via the Planet Bids electronic bidding system on or before 5:00 p.m. on October 9, 2023. License Requirements A Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $1000/day Contractor shall complete the Work in accordance with the Contract Documents and by the completion date set within the Contract Documents at the Contract Price fixed in the Contract. Contractor at Contractor's sole cost and expense shall perform all labor and services and furnish all the materials, tools, and appliances necessary or proper for performing and completing the Work in accordance with the Contract Documents. All the labor, services and materials shall be performed and furnished strictly pursuant to, and in conformity with the Contract Documents, and the directions of the ENGINEER as given from time to time during the progress of the work under the terms of the Contract, and also in accordance with the Contract Documents and the submittals to be furnished from time to time as provided herein. 5.2 INTERPRETATION OF CONTRACT DOCUMENTS. Should it appear to Contractor that the Work to be performed or that the Contract Documents are not sufficiently detailed or explained, or should any questions or doubts arise as to the true meaning of any part of the Contract Documents, or shall an error, conflict, ambiguity or mistake be apparent or discovered in the Contract Documents, including the quantity estimates, the Contractor shall make a written request to the District immediately or no later than five (5) days upon discovery of need for correction, clarification or interpretation of the point(s) in question. Upon receipt of such request, the ENGINEER shall provide the Contractor a written interpretation correcting, clarifying or interpreting the point(s) in question, which interpretation shall be final and become a part of the Contract Project Duration 120 working days
Award
Water / Sewer
$938,888.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 19, 2023
November 20, 2023
Los Monteros Dr, Dana Point, CA
Related To This Project
Dana Point, CA
--
Dana Point, CA
--
Dana Point, CA
Bid Date: Feb 13 2024
Dana Point, CA
--
Dana Point, CA
Bid Date: Mar 14 2019
Dana Point, CA
Bid Date: Mar 07 2024
Dana Point, CA
Bid Date: Apr 25 2024
Dana Point, CA
Bid Date: May 16 2024
Dana Point, CA
Bid Date: Apr 07 2022
Dana Point, CA
--
Dana Point, CA
Bid Date: Nov 18 2021
Dana Point, CA
Bid Date: Dec 23 2021
Dana Point, CA
Bid Date: Sep 20 2023
Dana Point, CA
Bid Date: Aug 18 2023
Dana Point, CA
Bid Date: May 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.