Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 7, 2024 at 7:00 PM
Updated October 1, 2024
Renovation of a water / sewer project in Charleston, South Carolina. Completed plans call for the renovation of a water / sewer project.
Questions must be submitted in writing no later than 3:00 pm on October 27, 2023 to newhamj@charleston-sc.gov or mailed to Frank Newham, Stormwater Management, City of Charleston, 2 George Street, Suite 2100, Charleston, SC 29401 The King Street Pump Station involves the construction of a stormwater storage feature (wet well), pump station, outfall pipe system, and utility relocations. The pump station is designed to provide additional capacity to the existing drainage system during storm events. It is anticipated that the pump station will be able to increase flow out of the intersection of King/Huger by 70,000 gallons per minute and also increase the storage capacity. This will drastically reduce total road closures and ponding related congestion at the busy intersection and significantly reduce the flooding impacts on surrounding properties. The pump station will be located at 900 King Street within Enston Homes, an affordable housing complex owned by the Charleston Housing Authority. Enston Homes, built in 1889, is designated as a site on the National Register of Historic Places. Due to the complex and unique components of the pump station and historic significance of the Enston Homes site, specific construction expertise is required for this project. The City of Charleston is seeking contractors with expertise and experience in: stormwater pump station projects, historic districts, tidally-influenced marine environments, urban settings with limited access points, and complex architectural, mechanical, and electrical systems that closely resemble the system conditions of the King Street Pump Station Project as well as meeting the minimum requirements listed below. The project is anticipated to be released for bid in the Fall of 2023. Project duration is anticipated to be approximately 18 months. This project is being funded in whole or in part by the South Carolina Infrastructure Investment Program (SCIIP), which is administered by the South Carolina Rural Infrastructure Authority (RIA) and funded by federal State and Local Fiscal Recovery Funds (SLFRF) through the American Rescue Plan Act (ARPA). All federal SLFRF requirements and SCIIP requirements will apply to the contract. All contractors and subcontractors are required to be registered in the federal System for Award Management (SAM) and may not be debarred from doing business with the federal government. Respondents on this work will be required to comply with all applicable federal regulations. Construction cost for the project is expected to be approximately 10 to 12 million dollars. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This Project is covered under the City of Charleston's Minority Business Enterprise (MBE) Program, administered by Ruth Jordan, MBE Manager, 2 George Street, Charleston SC, 29401, (843) 724-7434, jordanr@charleston-sc.gov. The City has established goals for both Minority Business Enterprise (MBE) and Women Business Enterprise (WBE). An MBE is a small business owned and controlled by a minority. A WBE is a small business owned and controlled by a woman. The minority or woman must own a minimum of fifty-one percent (51%) of the business and they must control the management and daily operations of the business in order to qualify. The goals for this contract are a combined 20% for minority and women-owned business enterprise participation. These goals will be applied to the overall contract
Post-Bid
Water / Sewer
$12,000,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 8, 2023
January 8, 2024
900 King St, Charleston, SC
Related To This Project
Charleston, SC
Bid Date: Oct 23 2023
Charleston, SC
--
Charleston, SC
Bid Date: Oct 12 2023
Charleston, SC
Bid Date: Dec 14 2023
Charleston, SC
--
Charleston, SC
--
Charleston, SC
--
Charleston, SC
--
Charleston, SC
--
Charleston, SC
Bid Date: Oct 25 2023
Charleston, SC
Bid Date: Feb 02 2024
Charleston, SC
Bid Date: Oct 16 2023
Charleston, SC
Bid Date: Oct 12 2023
Charleston, SC
--
Charleston, SC
Bid Date: Oct 13 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
![](https://projects.constructconnect.com/hubfs/science-bokeh2%20(1).webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.