BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Atlanta, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The project generally includes removing an existing signal, replacing with a roundabout, installing streetscape and dedicated protected bike lane, a new traffic signal along with milling and resurfacing and landscaping components. Should any question or need for information arise, it should be directed to Buckhead CID at tpeters@buckheadcid.com with subject line: Wieuca Road @ Phipps Blvd Roundabout [insert nature of email]. All questions must be submitted by email by 5:00 p.m. ET on Friday, December 8, 2023. The response to the questions will be posted as an addendum on the BCID website and the Georgia Procurement Website by 2 p.m. on Monday, December 11, 2023. a certified check or acceptable Bid Bond in an amount not less than five percent (5%) of the bid and made payable to Buckhead CID. Successful Bidder shall be required to furnish a Contract Performance Bond equal to 100% of the contract price and a Payment Bond equal to 110% of the contract price, with the terms and surety to be approved by Buckhead CID and the City of Atlanta, and furnish satisfactory proof of carriage of the insurance required. Bids will be considered only from pre-qualified bidders for work of this type and magnitude. Bidders shall be qualified as outlined below The Equal Business Opportunity (EBO) goals for this project are 25% MBE and 10% FBE%. All MBE and FBE firms must be certified by the City of Atlantas Office of Contract Compliance. Time is of the essence in the construction of this project. The Contractor shall commence work with adequate force and equipment on January 29, 2024 and shall complete the work in 548 days. Payment will be made to the contractor each calendar month based on the estimated work completed in place as prescribed. The Contract Time for completion of the Work for this Contract shall be as stated in the Project Manual. For failure to complete the Work within this period, the Contractor shall pay Buckhead CID liquidated damages of $1,169.00 per calendar day. Buckhead CID reserves the right to reject any or all bids,

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
17
Bidding Soon
1,421
All Active Projects
494
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 27, 2023

January 29, 2024

img_map_placeholder

Wieuca Rd NE, Atlanta, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.