BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Kearney, Nebraska. Working plans call for site work for a playground / park / athletic field.

Replace the current poured-in-place surface at E.K. and Mary Yanney Heritage Park, 2020 West 11th Street, Kearney, NE 68845. If you have any questions regarding this Request for Proposals, please contact Nate Halliwell at nhalliwell@kearneygov.org Peggy Eynetich City Clerk ZNEZ O7 Question Deadline 10/23/2023 at 2:00 PM CT The City of Kearney is an equal opportunity employer and requires all contractors, consultants, etc. to comply with all applicable federal and state laws and regulations. The City of Kearney reserves the right to reject any and all proposals and to accept the proposals it believes is in the best interest of the community. Scope of Work & Minimum Specifications o The proposal will include material, labor and equipment to remove the current poured-inplace surface and install the new tiled surface and concrete curbing. o Concrete Curbing and Curing: - The concrete mix shall be in accordance with Section 11:20 of the City of Kearney Standard Specifications for Municipal Construction (available under the Public Works Department at www.cityofkeamey orq. - The concrete shall be placed, consolidated to fill all voids, struck off to the required grade and floated smooth. After the water sheen has disappeared, the surface should be lightly brushed to a uniform texture. - In order to deter vandalism to the newly poured concrete slab, the Contractor should remain on site until concrete has cured. Contractor shall be responsible for removal, and replacement of concrete if vandalized prior to completion of entire job. - Within 24-48 hours of the concrete slab being poured, all forms shall be pulled and removed from the site. - Within 48-72 hours, the concrete shall be scored. Scoring should correspond to the dimensions of the curbing. o Concrete & Material Clean-up: All excess "cleaned out" concrete shall be removed by the Contractor. All forms of any other materials generated from the construction of the project shall be removed by the Contractor. o Site Restoration: Any areas that have been destroyed, or areas where ruts and depressions have been created, will be restored to the same grade and condition as the surrounding area by the Contractor. The City will be responsible for any necessary irrigation work and re-seeding or sodding. o Underground Utility Locations: Contractor is required to call Digger's Hotline to locate all utilities prior to construction as necessary. o Contractor must provide safety fencing or flagging, minimum fourfeet (4') high, around the perimeter of the construction area. o Replacement of the playground surfacing must be completed between June 3, 2024 and August 30, 2024. A proposed schedule should be submitted with the proposal. The city will allow for a 30-day construction window to complete the entire scope of work for the project..

Final Planning

Playgrounds / Parks / Athletic Fields

$69,821.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
16
Bidding Soon
177
All Active Projects
92
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 24, 2023

June 3, 2024

August 30, 2024

img_map_placeholder

2020 W 11th St, Kearney, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.