BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Orange Cove, California. Completed plans call for site work for a educational facility.

Install artificial turf at the front of Citrus Middle School. Detailed areas to be walked at mandatory site walk. Utilize Diamond Pro Spring Fescue turf or equivalent. a. Removal of 3 inches of grass and or dirt of existing lawn and excess soil. b. Adjust irrigation and cap any necessary sprinkler heads. c. Grade and compact the sub base. d. Install decomposed granite base. e. Provide a sand infill. Owner reserves the right to add or deduct any of the additive or deductive items after the lowest responsible and responsive bidder is determined. The lowest bid shall be determined on the amount of the base bid. Contract Time shall be 30 calendar days from the Notice to Proceed, and liquidated damages for delay shall accrue. See Agreement between Owner and Contractor for more information. Bids must be accompanied by a bidders bond, cashiers check, or certified check for at least ten percent (10%) of the amount of the base bid and made payable to the Owner. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum, as set forth in the Contract Documents.

Award

Educational

$57,800.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
15
Bidding Soon
345
All Active Projects
174
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2023

November 16, 2023

img_map_placeholder

1400 Anchor Ave, Orange Cove, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.