BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Alligator Point, Florida. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The Florida Department of Environmental Protection, Bureau of Design and Construction is soliciting formal, competitive Question Deadline 10/30/2023 Scope of Work 1. Work consists of coordinating, scheduling, obtaining and assembling at construction site all equipment, materials, permits, supplies, manpower and other essentials and incidentals necessary to perform Work as required and defined in this Project. The Work of this Contract will be performed at the structures shown on Drawings. B. Contractor shall furnish all material, labor, tools, supplies, permits, equipment, transportation, superintendence, barricades, temporary protection, bracing, shoring, temporary construction of every nature, insurance, taxes, contributions and all services and facilities, unless specifically excepted, and install all materials, items, and equipment required to complete the construction of the Project, as set forth in the Contract Documents. C. Refer to Section "Work Items" for a description of work. Work Item specifications, details, and drawings shall govern all repair operations. Locations where Work Items apply are shown on Drawings as symbols. 1.3 MEASUREMENTS: A. Before ordering any material or doing any Work, Contractor shall verify all measurements at the Project Site and shall be responsible for correctness of same. B. Before proceeding with each Work Item, Contractor shall locate, mark, and measure quantity of each item and report quantities to Engineer for each location. 1.4 WORK SEQUENCE: A. Prior to commencement of Work, meet with Engineer and Owner representatives to establish sequence and schedule of Work. Contractor shall give Owner notice of areas to be cleared at least 7 working days in advance of actual Work. B. Contractor shall notify Owner's representative at least 24 hours prior to commencing any abrasive blasting such as sandblasting, etc. operations. C. Work will be conducted in phases to provide least possible interference to activities of Owner's personnel and facility users. 1. Contractor's work hours shall be limited to comply with noise ordinances. Contractor is allowed to work as necessary to complete work within Owner's time schedule and conditions conducive to temperature sensitive materials. D. Contractor shall remove debris from Work Area on daily basis and dispose of same at authorized sites. E. Contractor shall remove dust and air transported material from remainder of facility at conclusion of operations in Work area

Award

Bridges / Tunnels

$670,000.00

Public - State/Provincial

Paving, Site Work

14

28

4

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
17
Bidding Soon
314
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

January 8, 2024

img_map_placeholder

146 Box Cut Rd, Alligator Point, FL


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.