BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a 4,122-square-foot educational facility.

Questions Due Date: Oct 5th 2023, 3:30 PM CDT For copy of bid documents contact: Tabatha Sinish at 312-813-7050 or Lakisha Smith at 773-703-4876 or Melanie Rush at 773-251-5718. Provide Labor and Materials: Apply Skim Coat, Install VCT (Chocolate colored), strip and re-wax floors (with 3 coats) for approximately 4,122 sq. ft of space between two floors. This job is expected to be completed in two parts in conjunction with abatement work. The first half (approximately 1,500 sq. ft) will be completed during Thanksgiving break and second half will completed during Christmas break. 1) Furnish and install Skim Coat. 2) Furnish and install commercial grade 12x12 VCT (Chocolate colored) 3) Strip and rewax floor with at least three coats of wax applied after install. 4) Dust, Fume & Odor Control Throughout and Construction Waste Disposal. 5) Contractor to secure necessary permits. 6) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 7) Not responsible for contractor errors as a result of non-field verification. 8) Materials and installation must comply with CPS Standards and Specifications as listed on ) SECTION 09 30 00 TILING 9) Secure job site overnight if work is not completed in one day. 10) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 11) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 12) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 13) Contractor is to remove and dispose of materials torn out and any construction debris. 14) All trash must be removed off-site by contractor. 15) Clean the surrounding area and make sure all is swept of debris. 16) All questions/requests must be received two (2) business days prior to bid closing.

Bid Results

Educational

$39,340.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
92
Bidding Soon
1,774
All Active Projects
778
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2023

November 23, 2023

img_map_placeholder

11411 S Eggleston Ave, Chicago, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.