EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 3, 2023 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Toboyne Township, Pennsylvania. Completed plans call for site work for a water / sewer project.

Forest District #3, Tuscarora State Forest Toboyne Township Perry County, Pennsylvania Project Description : Remove (2) existing 2,000 gallon aboveground vault fuel tanks (one gasoline; one diesel) and install (2) new 2,000 gallon above ground fuel tanks. DGS Small Business Certification Required Engineer's Estimate: $100,000-400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Deadline 10/23/2023 03:30 PM CDT Remarks All questions must be received through the Bid Express Service. Questions asked via email, phone, or otherwise will not be answered. BID INSTRUCTIONS AND IMPORTANT BID INFORMATION 1. All bids must be submitted electronically through Bid Express. Paper bids are not accepted. Note: The Department will not accept bids that are delivered in person or bids that are submitted via the Postal Service or delivery services, such as Federal Express or UPS. 2. The right is reserved, as the interests of the Commonwealth may require, to revise or amend the Bid Documents prior to the dates set for opening of bids. Such revisions will be announced by Addenda to the Bid Documents. Copies of all such Addenda issued will be sent to all parties receiving copies of the Bid Documents and must be acknowledged with the bid. 3. Contractor is to begin work within ten (10) days after receipt of Notice to Proceed, and to complete work within (90) Ninety calendar days. 4. The tenth (10th) day after receipt of Notice to Proceed shall be the official starting date unless the ten (10) day period is extended in writing by the Secretary. It is understood that if the work is not completed within the time above specified or such extension thereof, as shall be granted in accordance with the General Conditions, the Contractor shall pay the Commonwealth of Pennsylvania as liquidated damages and not as a penalty for non-completion of work, the amount of ($300)Three Hundred per day for each and every calendar day thereafter until the work shall be completed and accepted. Pursuant to Executive Order 2021-06, Worker Protection and Investment (October 21, 2021), the Commonwealth is responsible for ensuring that every worker in Pennsylvania has a safe and healthy work environment and the protections afforded them through labor laws. To that end, contractors and grantees of the Commonwealth must certify that they are in compliance with Pennsylvania's Unemployment Compensation Law, Workers' Compensation Law, and all applicable Pennsylvania state labor and workforce safety laws including, but not limited to: Construction Workplace Misclassification Act Employment of Minors Child Labor Act Minimum Wage Act Prevailing Wage Act Equal Pay Law Employer to Pay Employment Medical Examination Fee Act Seasonal Farm Labor Act Wage Payment and Collection Law Industrial Homework Law Construction Industry Employee Verification Act Act 102: Prohibition on Excessive Overtime in Healthcare Apprenticeship and Training Act Inspection of Employment Records Law

Bid Results

Water / Sewer

$179,849.00

Public - State/Provincial

Site Work

4

13

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Project Management and Coordination, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management
Division 26 - Electrical

Division 26 - Electrical

Electrical and Cathodic Protection, Facility Lightning Protection
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
65
Bidding Soon
919
All Active Projects
402
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

December 4, 2023

img_map_placeholder

Multiple Locations, Toboyne Township, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replace Aboveground Gas/Diesel Tanks At Bryner Maintenance HQ

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.