BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2026 at 8:00 PM

Updated May 21, 2026

Site work, paving and new construction of a bridge / tunnel in South Burlington, Vermont. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

South Burlington RAIZ(01) - East-West Alternative Transportation Crossing Project - Walk Bike Bridge over I-89 at Exit 14 Each BID must be accompanied by a certified check payable to the City of South Burlington for five percent (5%) of the total amount of the BID. A BID bond may be used in lieu of a certified check. LOCATION: Beginning at a point on the western side of the Exit 14 Interchange of Interstate 89, continuing alongside the I-89 southbound on ramp, crossing the interstate approximately 900-ft south of the US Route 2 bridge over the interstate, and continuing alongside the northbound off ramp to where it meets US Route 2 (Williston Road). TYPE OF CONSTRUCTION: Work to be performed under this project includes but is not limited to: Construction of a new shared use pathway and bridge over Interstate 89 including, construction of MSE walls, stormwater infrastructure, project lighting, and project landscaping. CONTRACT COMPLETION DATE: The Contract shall be completed on or before October 31, 2028. ENGINEERS ESTIMATE: For this Proposal the Engineers Estimate falls between $10,000,000 and $25,000,000. (Category G) QUESTIONS: During the advertisement phase of this project all questions shall be addressed to Ilona Blanchard, AICP, via email iblanchard@southburlingtonvt.gov and cc:ed to Aaron Guyette, VHB aguyette@vhb.com. All inquiries must be received by 4:30pm on Wednesday March 25, 2026. DAVIS BACON WAGE REQUIREMENTS: Bidders agree to abide by the Davis Bacon Wage Rate Schedule, which are appended to these Contract Documents. PREQUALIFICATION OF CONTRACTORS: All bidders must: (1)(a) be listed on the current Vermont Agency of Transportation (VTrans) Contract Administration listing of preapproved contractors for "Contractors List of Bridge Construction Category"; OR (1)(b) have submitted a complete annual prequalification application to VTrans Contract Administration a minimum of ten (10) working days prior to the bid opening and shall include a copy of their approval notice with their bid; AND (2) must submit a request for contract-specific prequalification using Form CA-82. Contract-specific prequalification will be determined by VTrans taking into consideration the prospective Bidder's current volume, degree of completion and rate of progress on uncompleted work then under contract in relation to the prospective Bidder's Maximum Dollar Capacity Rating (MDCR) and Number of Contract Capacity Rating (NCCR), and whether the prospective Bidder is approved for the specific work classification(s) for the contract. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$20,140,808.00

Public - City

New Construction, Paving, Site Work

206

6

97

5

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
288
Bidding Soon
2,946
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2026

June 2, 2026

Project location map

I-89, South Burlington, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.