Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 15, 2023 at 7:00 PM
Updated June 11, 2024
Demolition, site work, paving, remodeling and renovation of a sidewalk / parking lot in Cathedral City, California. Completed plans call for site work for a sidewalk / parking lot.
SCOPE OF WORK: Cathedral Canyon Drive Sidewalks and Multiuse Trail (C08505) The scope of work consists of furnishing all supervision and labor, materials, necessary equipment, and tools, utility work, traffic control and public services coordination required for the completion of the Project. The work to be done includes mobilization, traffic control, stormwater BMPs, construction staking and perpetuation; grading; clearing and grubbing; removal of utilities, trees, AC pavement, PCC, base, subgrade, native material, and unclassified material; construction of AC pavement over compacted CAB; construction of full depth AC; construction of PCC sidewalk, curb ramp, curb and gutter, cross gutter and spandrel, and retaining curb; construction of slough wall; construction of decomposed granite over compacted native material; adjustment to grade and/or relocation of utilities; construction of cabinet foundation and extension of existing conduit and wiring for relocated utility; coordination for relocation of utilities by others; signing and striping; and furnishing and installation of speed feedback sign and hybrid beacon per project documents. Work shall be performed, placed, constructed, or installed within public streets right-of-way. All work and resulting facilities will fully conform to the currently adopted Coachella Valley State Implementation Plan (CVSIP) for PM-10 including Best Management Practices during the construction process. Date Palm Drive Expansion (C08508) The scope of work consists of furnishing all supervision and labor, materials, necessary equipment, and tools, utility work, traffic control and public services coordination required for the completion of the Project. The work to be done includes mobilization; traffic control; stormwater BMPs; construction survey and perpetuation; grading; clearing and grubbing; demolition, removal, hauling, and disposal of pavement, subgrade, curb and gutter, sidewalk, driveway; landscaping area, unclassified excavation, fencing, concrete footing,, handrailing and utilities; construction of wall; compaction of native material;, construction of AC and PCC pavement; construction of cement-stabilized base; construction of PCC driveway, curb ramps, curb and gutter, and sidewalk; construction of storm drain improvements; relocation or adjustment existing utilities; installation of railing, and signing and striping. Work shall be performed, placed, constructed, or installed within public streets right-of-way. All work and resulting facilities will fully conform to the currently adopted Coachella Valley State Implementation Plan (CVSIP) for PM-10 including Best Management Practices during the construction process.
Award
Sidewalks / Parking Lot
$3,884,603.00
Public - City
Demolition, Paving, Remodeling, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 19, 2023
November 20, 2023
Cathedral Canyon Dr, Cathedral City, CA
Related To This Project
Cathedral City, CA
--
Cathedral City, CA
--
Cathedral City, CA
--
Cathedral City, CA
--
Cathedral City, CA
--
Cathedral City, CA
Bid Date: Feb 12 2024
Cathedral City, CA
Bid Date: Feb 29 2024
Cathedral City, CA
Bid Date: Mar 20 2024
Cathedral City, CA
Bid Date: Jun 01 2023
Cathedral City, CA
Bid Date: Sep 25 2023
Cathedral City, CA
--
Cathedral City, CA
--
Cathedral City, CA
--
Cathedral City, CA
--
Cathedral City, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
