BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Wayland, Massachusetts. Completed plans call for the renovation of a clubhouse / community center.

Roofing and Flashing; Metal Windows; Waterproofing, Damp-roofing and Caulking; Acoustical Tile; Tile; Resilient Floors; Glass & Glazing; Painting; Plumbing; Mechanical; Electrical; Fire Protection . Question Deadline 10/17/2023 at 10:00 AM ET The Contractor shall prevent surface water and subsurface or groundwater from flowing into excavations or earthwork areas which would cause flooding of the Project Site and surrounding area or softening or loosening of the soil at excavation or earthwork sub-grades. B. The Contractor shall provide adequate and satisfactory dewatering and drainage of excavations and furnish all materials and equipment and do all incidental work required in conjunction with the furnishing, installing and maintaining of same to permit construction to proceed in the dry. The Contractor may choose any satisfactory method he wishes for controlling groundwater or surface water encountered in the Work, provided the dewatering required is performed in accordance with all federal, state, and local codes, ordinances, and regulations. The Contractor shall obtain all necessary permits and assume all responsibility for the adequacy of the methods, materials and equipment employed. The Contractor shall bear the full cost of providing the dewatering at all times of the year, throughout the construction period, and no additional payment shall be made for this work. The Contractor shall take all precautions necessary to prevent loosening or softening of the sub-grade. In this regard, the Contractor shall at all times be prepared to alter his construction method or sequence. Dewatering and control of water shall be conducted as necessary to prohibit seepage, groundwater flow or surface infiltration and runoff from, in any way, undermining or otherwise damaging adjacent structures and utilities. Bid Result - WATERPROOFING DAMPPROOFING CA - Superior Caulking & Watt - 37000 ROOFING AND FLASHING - Capeway Roofing System - 223600 GLASS AND GLAZING - Aluminum & Glass Conc - 28818 TILE - Santangelo Flooring - 66498 ACOUSTICAL TlLE - Cheviot Corporation - 98589 RESILIENT FLOORS - Capital Carpet & Flooring - 126981 PAINTING - Alpha Contracting Assoc - 63000 FIRE PROTECTION - Yankee Sprinkler - 313000 PLUMBING - LaPan mechanical inc - 234500 MECHANICAL - G & H Heating &Cooling - 1020800 ELECTRICAL - Wayne J. Griffin Electric - 649000

Bid Results

Clubhouse / Community Centers

$4,972,286.00

Public - City

Renovation

4

48

58

4

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
327
Active Projects
166
Bidding Soon
3,076
All Active Projects
1,293
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

April 1, 2024

img_map_placeholder

8 Andrew Ave, Wayland, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.