Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Astor, Florida. Completed plans call for site work for a water / sewer project.
The purpose of this solicitation is to solicit competitive sealed submittals to furnish Pearl Street Boat Ramp - Gangway and Floating Dock for Lake County, Florida. Question Deadline 10/27/2023 Direct all inquiries to the Contracting Officer (official point of contact) listed: Bill Ponko, CPPO, CPPB, Contracting Officer Telephone: 352-343-9489 E-mail: Bill.Ponko@lakecountyfl.gov A qualified licensed contractor (hereinafter Contractor) shall furnish all labor, materials, equipment, component/devices, transportation, fuel, supervision, surveying, permits, inspections, and all other incidentals necessary to complete all necessary work, all in accordance with all parts of this solicitation and Construction Documents provided in Exhibit D for the Pearl Street Boat Ramp, located at 25140 East Pearl Street, Astor, FL 32102 Contractor to furnish and install a complete turn-key aluminum gangway and floating dock, construction of concrete sidewalk with gangway anchorage concrete footing, installation and maintenance of silt fence and floating turbidity barrier, and other BMPs, as required, for management and control of sediment, erosion, and turbidity. Demolition Work: Removal and disposal of existing wooden dock and concrete sidewalk. **Note: Contractor must obtain Lake County Parks staff inspection approval prior to pouring concrete, refer to form included in Exhibit E - Concrete Pad & Sidewalk Preapproval which must be submitted for approval a minimum 2 days before pouring concrete. Thisinspection isin addition to Building Inspector inspection. 3. Miscellaneous Items to Note: 3. 1. The Contractor will be responsible for planning and providing signage and barriers, as required, to ensure the safety and security of the site from the public, including neighbors and visitors, children, and staff, during construction as well as after boat ramp hours. Boat ramp must remain open for public use during work. 3. 2. Contractor to remove and relocate existing fencing and signs/kiosks as necessary for the construction of proposed improvements. 3. 3. Contractor is responsible for debris/trash management and must provide a dumpster or must remove all construction debris/discarded materials/trash on a daily basis. No discarded construction material shall be dumped or remain on site unless contained within a dumpster provided by the Contractor. Dumpsters must be properly maintained to prevent overflow of debris. 3. 4. Contractor is responsible for regrading and resodding all areas impacted by construction of the new facilities. Contractor shall provide all sod required. No grass seeding allowed. 3. 5. Contractor to provide all necessary clean fill material, grading, and compaction before construction of proposed sidewalk/footing. 3. 6. Building permits are required for the proposed improvements, refer to Permit Requirements section below for additional requirements. 3. 7. Fire extinguisher, if required by Fire Inspector, will be furnished and installed by Lake County. 3. 8. Contractor will be required to provide a timeline/work schedule and a detailed cost breakdown (schedule of values) at the preconstruction meeting for review which shall be the base for all payment applications. 3. 9. Final Payment: A Certificate of Completion/Occupancy issued by the Office Building Services, (352) 343-9653, must be provided on or before submittal of the final payment application.
Award
Water / Sewer
$110,561.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 8, 2023
January 8, 2024
25140 E Pearl St, Astor, FL
Related To This Project
Astor, FL
Bid Date: May 01 2024
Astor, FL
--
Astor, FL
Bid Date: May 07 2024
Astor, FL
--
Astor, FL
Bid Date: Dec 03 2024
Astor, FL
Bid Date: Dec 12 2024
Astor, FL
Bid Date: Mar 25 2022
Astor, FL
Bid Date: Apr 12 2023
Astor, FL
Bid Date: Apr 12 2023
Astor, FL
Bid Date: Mar 31 2022
Astor, FL
Bid Date: Feb 02 2022
Astor, FL
Bid Date: Jan 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.