Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Pemberton Township, New Jersey. Design plans call for site work for a water / sewer project.
Whitesbog Village General Store Septic System Replacement Location: Brendan Byrne State Forest Pemberton Township, Burlington County, NJ The initial Construction Cost Estimate (CCE) for this project is $ 125,000. The Consultant shall review this Scope of Work and provide a narrative evaluation and analysis of the accuracy of the proposed project CCE in its technical proposal based on its professional experience and opinion. The Current Working Estimate (CWE) for this project is $ 225,625. The CWE includes the construction cost estimate and all consulting, permitting and administrative fees. The General Store building is a historical structure within Whitesbog Village. Whitesbog Village is the site of the largest New Jersey cranberry farm founded in the early 1900s. The entire village is listed on the National and State Registers of historical places. The location is also part of the Brendan T. Byrne State Forest (formerly known as Lebanon State Forest). The first cultivated blueberry was tested and developed by Elizabeth Coleman White on this agricultural landscape in 1916. The General Store provided supplies for the village residents and hand pickers of the cranberry bogs and blueberry fields. Whitesbog includes the village and the surrounding 3,000 acres of cranberry bogs, blueberry fields, reservoirs, sugar sand roads, bridges, boardwalks and Pine Barren's forests. The site's historic buildings consist of the general store, workers' cottages, a boarding house, a water tower, a school, a superintendent's house, and Elizabeth White's home "Sunigive". The entire region is an important part of New Jersey history and the history of the industrialized fruit culture in the United States. The Whitesbog Village General Store supports the year round educational and visitor programs, tours and specialty events such as Blueberry Festival, Cranberry Harvest, and Monthly Full Moonlight Walks during the full moon of every month. Today, the General Store sells a variety of historical memorabilia relating to the cranberry & blueberry contribution of the nation's agricultural development. The General Store existing septic system is operating inefficiently due to age and is beyond repair. The septic system requires replacement in order to meet any current regulations and codes. This may also include the replacement of any septic tanks, piping and drainage bedding and/or absorption materials The General Store was built in 1924 with masonry foundation and wood framing. The 2570 sq. foot 2-story building is classified Use Group A3 and Construction Class 5B. The basement layout includes a mechanical room with three (3) sump pumps & pits and a rear basement access door. The first floor includes the merchant & gift store, historical post office and a separate women and men's restroom. The second floor plan includes three (3) office spaces and a single toilet room.
Design
Water / Sewer
$225,625.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 9, 2023
November 1, 2024
120 W Whites Bogs Rd, Pemberton Township, NJ
Related To This Project
Pemberton Township, NJ
--
Pemberton Township, NJ
Bid Date: Oct 26 2021
Pemberton Township, NJ
Bid Date: Aug 11 2020
Pemberton Township, NJ
Bid Date: Sep 22 2020
Pemberton Township, NJ
Bid Date: Apr 02 2024
Pemberton Township, NJ
Bid Date: Jul 10 2024
Pemberton Township, NJ
Bid Date: Aug 29 2024
Pemberton Township, NJ
Bid Date: Jul 30 2024
Pemberton Township, NJ
Bid Date: Oct 02 2023
Pemberton Township, NJ
Bid Date: Feb 08 2022
Pemberton Township, NJ
Bid Date: Sep 17 2020
Pemberton Township, NJ
Bid Date: Sep 21 2023
Pemberton Township, NJ
Bid Date: Jun 08 2023
Pemberton Township, NJ
Bid Date: Mar 15 2023
Pemberton Township, NJ
Bid Date: Jan 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.