BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Pageland, South Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Award: Driggers Construction, LLC for $2,806,274.93 Const. of +/-1,530LF Phase IIA Ind Park Lane, +/-1,425 LF Phase IIB North Park Lane, +/- 1,525 LF Resurface Existing Phase I Roadways, +/- 139-Acre Lynches River Ind Park along Dove Sutton Road. (S-682) Near the Town of Pageland Chesterfield County, South Carolina Question Deadline 11/01/2023 at 5:00 PM ET All questions about the meaning or intent of the Bidding Documents are to be submitted to the Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Any questions for clarification will be emailed to swhaley@alliancece.com The Owner reserves the right to waive any informality or to reject any or all bids. Base Bid: This project consists of providing all required materials, equipment, and labor necessary to complete the construction +-1,530-LF Phase IIA Industrial Park Lane; +-1,425-LF Phase IIB North Park Lane; and +-1,525-LF Resurface Existing Phase I Roadways (Industrial Park Lane and East Park Lane) at the +-139-Acre Lynches River Industrial Park Along Dove Sutton Road (S-682) Near the Town of Pageland Chesterfield County, South Carolina. The Roadways and Stormwater Improvements include Clearing, Grubbing to construct approximately 3,000 Linear Feet (LF) of Two (2) Twelve (12)-foot Lanes with Shoulder and Ditch Section, Storm Drainage Systems, Three (3) major culvert crossings, and Two (2) Stormwater Basins, Erosion Control Measures, and Grass Disturbed Areas. Specific Details are included within the Construction Plans and Technical Specifications. Chesterfield County requests when constructing the roadways, that the connection from Dove Sutton Road down to Lot 3 be constructed to sub-grade before completing the remaining portion of the roadways to allow access for construction of Lot 3. Contractors shall have a proper and active South Carolina License Classification.

Award

Roads / Highways

$2,806,275.00

Public - County

Paving, Site Work

47

15

5

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
69
Bidding Soon
1,036
All Active Projects
475
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

January 8, 2024

img_map_placeholder

State Rd S-13-682, Pageland, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.