BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Moss Point, Mississippi. Completed plans call for site work for a water / sewer project.

proposals for the supply and installation of an AMI Water Meter System. Neither Owner nor Engineer will be responsible for Proposal Documents, including addenda, if any, obtained from sources other than the designated electronically General water meter requirements: 1. Water meters that provide integrated, time interval data not less than hourly. 2. Water meters that replace existing water meters and increase the accuracy of the reads. associated with the system through use of modern ultrasonic technology-based products. 3. Water meters that improve the efficiency of the water system, lower operating costs, and aid in customer service. 4. Water meters that use an Exclusive/Primary Licensed FCC Frequency, or equivalent, to enable robust operation, high-capacity bandwidth, interoperability with current and future applications and future cellular network upgrades. 5. Water meters or RF solutions that provide leak detection on the customer side of the meter. 6. The system must be capable of operating in both AMI fixed network and AMR drive-by as a back-up system should the AMI infrastructure become inoperable WITHOUT physically changing out any part of the meter or physical manipulation to the meter. 7. Water meters that only offer AMR functionality (drive-by reading) will not be considered. Water meters that must change a Radio Signal Device, Meter Transmitting Unit (MTU), or similar component to switch from AMI to AMR will not be considered 8. The meter must not have registers that need replacement or utilize endpoints to be affixed to meter. For all meters 5/8" to 12": 1. All cold-water meters must use solid state measuring technology with no moving parts. 2. All sensors and electronics shall be designed so that no direct exposure is made with water. 3. Meters shall be produced in an ISO 9001C facility. 4. All meters shall be manufactured from either composite or stainless steel, brass meters will not be considered. 5. All sensors shall be completely separated from the fluid, and coatings and water quality shall not affect measurement accuracy or warranty. For meters 5/8" and 1": 1. The 5/8" and 1" meters shall have the ability to listen for leaks on the upstream side of the meter. 2. Each meter shall include all components necessary to listen for noise levels on service and distribution lines for the purpose of locating potential leaks in the piping. The acoustic leak detection sensor and electronics must be integral to the meter, requiring no external hardware or wired connections. 3. The meter shall collect noise data from the water column. 4. All meters must have a minimum operating working pressure of 250 PSI.

Post-Bid

Water / Sewer

$800,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
80
Bidding Soon
974
All Active Projects
458
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 9, 2023

December 11, 2023

img_map_placeholder

To Be Determined, Moss Point, MS


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.