BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Frisco, Texas. Completed plans call for site work for a sidewalk / parking lot.

Miscellaneous Curb Inlet Reconstruction By the City of Frisco, Texas. The City of Frisco ("City") is accepting bids for Miscellaneous Curb Inlet Reconstruction. The deadline for questions is October 19, 2023 at 4:00 PM CT. All questions should be emailed to purchasing@friscotexas.gov. Intent to Bid Due Date: Oct 26th 2023, 2:00 PM CDT Receipt of responses does not bind the City to any contract for said products or services, nor does it give any guarantee that a contract for the CSB will be awarded. For additional information concerning this Bid please contact: Steve Cone, NIGP-CPP, CPPB Purchasing Manager scone@friscotexas.gov 972 292 5542 Kelsey Luce Buyer kluce@friscotexas.gov 972 292 5541 The work to be performed under the provisions of these Contract Documents consists of the removal and replacement, at the correct grade, of curb inlet tops, throats, and curbs. PROJECT DESCRIPTION Prior to the start of any work, the awarded contractor shall: o Attend a mandatory pre-construction meeting at the Frisco Public Works facility at an agreed upon time and date. o Submit a complete schedule that includes a proposed order in which all repairs will be done. o Obtain a City of Frisco Right of Way permit for the project. Permit charges are waved for City projects. o Verify actual work location and elevation of all utilities prior to commencement of any work. o Submit mix designs for City approval. All inlet concrete, including throat and curb and gutter, shall be Class "P1" with a 4000 PSI, 28 day compressive. Scope Of Work o All tops shall be removed to a minimum of six inches into the vertical walls of the existing inlet in preparation for the placement of the new top. o Existing lids will be allowed to be re-used on the new tops o If an existing lid is damaged during the inlet top removal, it shall be replaced at the contractor's sole expense. o Contractor will be responsible for proper backfill and compaction requirements of all excavations using suitable backfill material. o Items considered subsidiary to the items on the bid form will include all required reinforcing steel, all concrete saw cutting, membrane curing for all placed concrete, saw joint cutting of pavement, joint sealing of pavement, trucking costs to haul off any and all removed spoils, trucking costs for delivery of any needed materials, any forms needed for concrete replacement, and any sprinkler and/or irrigation repairs/parts that are needed due to construction activities. o All listed inlets are located on residential streets and will require that the residents be notified of upcoming work in order to relocate parked cars and other items as necessary. This communication will be handled by the City's representatives. o Contractor will be responsible for any necessary irrigation system repairs and turf replacements due to irrigation repairs. o Contractor will be responsible to ensure United States mail is not interrupted. At all times, temporary mailboxes will be used, if necessary, to ensure the delivery the of US mail. o No inlet with a removed top shall be left uncovered and unsecured during overnight or non-working hours. o All concrete pours shall be scheduled with the City's representative in order to allow them to be present during the concrete replacement. o All concrete placed for pavement, regardless of pavement depth, shall be vibrated by mechanical means. o All existing throat subgrade shall be compacted in place to a density not less than 95% before any new pavement is placed. The City shall schedule any needed testing for the projects. o The unit price paid for each location shall include the replacement of the inlet throat up to 3 feet from the back of the curb, as shown in the attached City Standard Construction Details PROJECT LOCATIONS All inlets targeted for top replacement have been marked in the field. o 2535 Blackstone Drive o 1107 Deer Lake Drive o 10809 Copperwood Drive o Hansford Lane @ Sleepy o 9212 County Down Lane

Post-Bid

Sidewalks / Parking Lot

$700,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
66
Bidding Soon
3,659
All Active Projects
1,471
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.