BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 25, 2023 at 8:00 PM

Updated June 5, 2024

Site work for a water / sewer project in Warrenton, Missouri. Completed plans call for site work for a water / sewer project.

Work to be performed under this contract will be performed in two phases. Phase I includes the installation of approximately 3,340 LF of 8" to 18" gravity sewer, including a siphon sewer consisting of 109 LF of 6" PVC and 105 LF of 8" PVC. Approximately 20 manholes, surface restoration, and other associated work is included. The upstream end of this project will connect to the existing sanitary sewer near 319 South Morgan Street. The downstream limits of this project will end southwest of the intersection of Big Creek and the Norfolk Southern Railroad right-of-way. Phase II includes the installation of approximately 2,212 LF of 8" and 24" gravity sewer, including 288 LF of 24" restrained joint PVC within jack and bored 36" steel casing pipe. Approximately 10 manholes, surface restoration, and other associated work is included. The proposed pipeline will cross the Norfolk Southern Railroad right-of-way. The upstream end of this project will connect to the downstream end of Phase I southwest of the intersection of Big Creek and the Norfolk Southern Railroad right-of-way. The downstream limits of this project will connect to the existing sanitary sewer along Veterans Memorial Parkway near Market Street Center. All questions can be submitted to Jeff Huck with Gonzalez Companies, LLC via email at jhuck@gocos.net. Questions received after 4 P.M. on October 23, 2023 will be rejected. A pre-Bid conference will not be held for this Project.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

26

10

2

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
111
Bidding Soon
1,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2023

November 27, 2023

Project location map

Multiple Locations, Warrenton, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.