BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Warrenton, Missouri. Completed plans call for site work for a water / sewer project.

Work to be performed under this contract will be performed in two phases. Phase I includes the installation of approximately 3,340 LF of 8" to 18" gravity sewer, including a siphon sewer consisting of 109 LF of 6" PVC and 105 LF of 8" PVC. Approximately 20 manholes, surface restoration, and other associated work is included. The upstream end of this project will connect to the existing sanitary sewer near 319 South Morgan Street. The downstream limits of this project will end southwest of the intersection of Big Creek and the Norfolk Southern Railroad right-of-way. Phase II includes the installation of approximately 2,212 LF of 8" and 24" gravity sewer, including 288 LF of 24" restrained joint PVC within jack and bored 36" steel casing pipe. Approximately 10 manholes, surface restoration, and other associated work is included. The proposed pipeline will cross the Norfolk Southern Railroad right-of-way. The upstream end of this project will connect to the downstream end of Phase I southwest of the intersection of Big Creek and the Norfolk Southern Railroad right-of-way. The downstream limits of this project will connect to the existing sanitary sewer along Veterans Memorial Parkway near Market Street Center. All questions can be submitted to Jeff Huck with Gonzalez Companies, LLC via email at jhuck@gocos.net. Questions received after 4 P.M. on October 23, 2023 will be rejected. A pre-Bid conference will not be held for this Project.

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

26

10

2

4

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
108
Bidding Soon
1,508
All Active Projects
662
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 26, 2023

November 27, 2023

November 21, 2024

img_map_placeholder

Multiple Locations, Warrenton, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.