BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 18, 2023 at 8:00 PM

Updated January 29, 2024

Site work and paving for a mixed-use development in Robins, Iowa. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Description: Concurrent with W. Main St. Reconstruction Phase 1 project. Installation of 10 foot wide pedestrian/bicycle trail along Stamy Rd. as connector of W. Main St. to the Cedar Valley Nature Trail and the future ITC trail to the south. Estimated Cost: $600,000 Estimated Start: Spring 2025 Funding Sources: Surface Transportation Block Grant (State Aid STBG) and Local Funds Location: Along the west side of Stamy Rd. from W. Main St to the future ITC Trail Funding Sources: Surface Transportation Block Grant (State Aid STBG) and Local Funds

Final Planning

Sidewalks / Parking Lot

$600,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
91
Bidding Soon
1,102
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

Project location map

Stamy Rd, Robins, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.