BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated May 30, 2026

Site work for a transportation facility in Boston, Massachusetts. Completed plans call for site work for a transportation facility.

Work consists of the replacement of existing tunnel ventilation equipment at multiple locations, the installation of jet fans in the Southwest Corridor Tunnel, the replacement of the station’s existing electrical substation, the construction of a new Eversource network transformer vault and incoming feeders, and various state-of-good-repair improvements at the station. Project Number D02CN02 Estimated Cost $33,323,484 Contractor Qualification DCAMM Cert. and Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

GC Bidding

Transportation Terminals

$33,323,484.00

Public - State/Provincial

Site Work

398

30

2

2

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
743
Active Projects
469
Bidding Soon
4,729
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2026

August 11, 2026

Project location map

145 Dartmouth St, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.