Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a bridge / tunnel in Miami Beach, Florida. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of January 9,2024, project was awarded, March is anticipated start date. The scope of work for this project is outlined in the City's Water System Master Plan dated October 2019, project W-39. The work includes the complete replacement of the existing 16-inch cast-iron aerial water main crossing that is currently attached to the 41st Bridge between Indian Creek and Collins Avenue. The existing water main is approximately seventy (70) years old and was prioritized in the master plan due to the high probability and consequence of failure. In addition, hydraulic modeling performed by the City has determined that upsizing the system to a 20-inch diameter (I.D) (Ductile Iron Pipe) will provide the required flow capacity to support anticipated growth and increasing demands along Collins Avenue in the mid-beach area. The proposed water main route is approximately 1,280 linear feet (LF) in length, with 920 LF HDPE DR 11 Pipe (20-inch), 300 LF Ductile Iron Pipe (20-inch), and 60 LF Ductile Iron Pipe (16-inch). The work set forth within these contract documents include the furnishing of all labor, materials, equipment, services, and incidentals necessary to complete the required work described here including all appurtenant work, complete, tested, and ready for operation, including temporary utilities and facilities as required, all surveying work for layout construction and as-builts, all in conformance with these Contract Documents and City of Miami Beach Public Works Standards. Question Deadline 10/30/2023 at 5:00 PM ET The anticipated award date for this project is December 13, 2023. A notice to proceed is anticipated to be issued in December of 2023
Award
Bridges / Tunnels
$2,065,959.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 14, 2023
December 14, 2023
41st St, Miami Beach, FL
Related To This Project
Miami Beach, FL
Bid Date: Oct 18 2023
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Nov 03 2023
Miami Beach, FL
--
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Dec 22 2023
Miami Beach, FL
Bid Date: Nov 15 2023
Miami Beach, FL
Bid Date: Dec 18 2023
Miami Beach, FL
Bid Date: Oct 30 2023
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Oct 19 2023
Miami Beach, FL
Bid Date: Nov 02 2023
Miami Beach, FL
Bid Date: Oct 06 2023
Miami Beach, FL
--
Miami Beach, FL
Bid Date: Oct 04 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.