BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Aurora, Colorado. Working plans call for site work for a water / sewer project.

Pre-Solicitation for W9128F24R0050 On or about 15 May 2024, this office will issue Request for Proposal (RFP) for Resilient Surveillance Mission Cooling Water Supply. The solicitation will close on or about 18 June 2024. This solicitation is Unrestricted. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Provisions in the solicitation documents will provide a site visit date and detailed information (meeting place, time, points of contact, and access requirements). DO NOT submit requests for plans and specifications to the site visit personnel. See 'Obtaining Solicitation Documents' below. Project Description (approx. quantities): This project will construct a resilient non potable water well to replace the existing non-operational well as a source of backup water inside the PL-1 mission area at Buckley SFB. The main goals is to abandon the existing non potable water well in place, remove the existing underground storage tank if possible, demolish existing pump house which will include HEMP shielding, piping, and other water distribution system components, construct a new well into the lower Arapahoe aquifer, construct a new 1,000 SF pre-engineered pump house with HEMP equipment protection, construct a tie between the well and the cooling tower sump for automated switch over between the primary (City) and backup (well), demolish the existing well production water meter and replace with new one, and provide security escort during construction. Project Period of Performance: 730 calendar days from construction NTP Provisions will be included for Liquidated Damages. Performance and Payment Bonds will be required. The above project description is for information only. Project scope of work is subject to change. RFP Evaluation Criteria: Firms participating in the solicitation will submit technical requirements in accordance with Section 00 22 00 PROPOSAL SUBMISSION REQUIREMENTS, INSTRUCTIONS AND EVALUATION. Submissions will be evaluated based on a best value approach considering technical elements for evaluation (i.e., Past Performance, Technical Approach, Key Personnel, and Small Business Participation). An adjectival method of evaluation will be used to evaluate all technical factors. Price will be evaluated separately for reasonableness and realism. A Best Value selection will be considered after reviewing price and technical factors. The estimated construction cost of this project is between $5,000,000 and $10,000,000. THE PROCUREMENT INTEGRATED ENTERPRISE ENVIRONMENT (PIEE) WILL BE USED TO DISTRIBUTE CONTRACT DOCUMENTS. REGISTRATION INSTRUCTIONS TO PIEE ARE SHOWN BELOW. ACCESS TO RFP DOCUMENTATION IS MADE FREE OF CHARGE. Point of Contact: All RFP questions shall be submitted on ProjNet (ProjNet access, and additional guidance, will be given at time of solicitation issuance) Bidders (Offerors) Registration instructions are as follows: Every Vendor must register in the Procurement Integrated Enterprise Environment for the specific applications they wish to use. During registration, offerors will need to register for the solicitation module with the relevant role (Proposal Manager). To use an application in the Procurement Integrated Enterprise Environment system, you must establish a personal account in the system. This account is activated by your Government Administrator or the Procurement Integrated Enterprise Environment Customer Support Center. You will need to take several steps to establish your personal account: On the PIEE Home Page, click the Help/Training button in the upper right-hand corner for steps needed to complete before registering. Complete your Vendor activation requirements (See Vendors Getting Started Section on the Help/Training page). 1. Set up your PC to use the applications (See Machine Setup Link on the Help/Training page). 2. Self-register as "Vendor" or your Contractor role for your CAGE codes (See the demo below for help with Self Registration). 3. Have your GAM activate your account. 4. Additional registration instruction and step-by-step walkthrough can be found at: https://pieetraining.eb.mil/wbt/xhtml/wbt/portal/overview/vendorRegister.xhtml UPLOADING PROPOSAL TO PIEE: Detailed instruction on the uploading of proposals can be found at: https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/solicitation/proposals.xhtml PIEE Web based training: https://pieetraining.eb.mil/wbt/ Please direct pre-solicitation procurement questions to the Contracting Specialist, Nancy Garside via email at gloria.garside@usace.army.mil, add the Solicitation Number and Name in the Subject Line of the email. PHONE CALLS WILL NOT BE ACCEPTED. DATES ARE ESTIMATES AND SUBJECT TO CHANGE. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$10,000,000.00

Public - Federal

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
113
Bidding Soon
1,653
All Active Projects
686
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.