BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Renovation of a service station / car wash facility in Springfield, Missouri. Completed plans call for the renovation of a service station / car wash facility.

Scope: the project includes the installation of electric vehicle (ev) chargers within the rental car qta area including demolition/removals, concrete curb (280+ lf), concrete/asphalt pavement (4,500+ sf), electrical conduit, junction boxes and wire, ev chargers, traffic control, signage, bollards, and pavement marking. Each bidder shall examine all Invitation for Bid documents and shall judge all matters relating to the adequacy and accuracy of such documents. Any inquiries or suggestions concerning the interpretation, clarification, or additional information pertaining to the Invitation for Bid shall be made in writing and submitted via email to the Buyer. The Buyer's contact information is listed on the cover page of this bid document. 1.4.1 The cutoff date for questions and substitution requests is October 31, 2023, at 12:00 P.M. (CST). 1.4.2 Any information given to a prospective bidder concerning an invitation will be furnished to all prospective bidders as an addendum to the invitation if such information is necessary to bidders in submitting bids. Bid bond: each bid must be accompanied by a bid bond in the form of a cashier's check made payable to the city of springfield - director of finance, or a bid bond duly executed by the bidder as principal and having as surety thereon a surety company satisfactory to the city. The bond so furnished shall be in the amount not less than five percent (5%) of the amount of the total bid price. Checks or bid bonds will be returned to all except the three (3) lowest qualified bidders within ten (10) days after the opening of bids and the remaining checks or bid bonds will be returned within five (5) working days after the city of springfield and the successful bidder have executed the contract for the work. 2.3.2 performance bond, and a labor and materials payment bond: the contractor shall furnish a performance bond and a labor and materials payment bond with surety approved by the city and on the forms approved by the city. Each bond shall be in the full amount of the contract conditioned upon the full and faithful performance of all major terms and conditions of this contract and payment of all labor and material suppliers. The date of the bonds shall be the same as the date of the city's execution of the contract. The bonds shall be automatically increased in amount and extended in time without formal and separate amendments to cover the full and faithful performance of the contract in the event of change orders regardless of the amount of time or money involved. It shall be the contractor's responsibility to notify his surety of any changes affecting the general scope of the work or changes in the contract price. It is further mutually agreed between the parties hereto that if at any time after the execution of this agreement and the surety bond(s) hereto attached for its faithful performance and payment of labor and material suppliers, the city shall deem the surety or sureties upon such bond(s) to be unsatisfactory, or if, for any reason, such bond(s) ceases to be adequate to cover the performance of the work, the contractor shall, at its expense, within five (5) days after the receipt of notice from the city to do so, furnish an additional bond or bonds, in such form and amount, and with such surety or sureties as shall be satisfactory to the city. In such event, no further payment to the contractor shall be deemed to be due under this contract until such new or additional security for the faithful performance of the work and the payment of labor and material suppliers shall be furnished in a manner and form satisfactory to the city. The corporate surety on any performance or payment bond must be licensed by the state of missouri and if the required bond exceeds $50,000.00 must be listed in united states treasury circular 570.

Bid Results

Service Station / Car Wash

$1,035,895.00

Public - City

Renovation

15

8

8

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
40
Active Projects
25
Bidding Soon
346
All Active Projects
134
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 14, 2023

December 14, 2023

img_map_placeholder

To Be Determined, Springfield, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.