Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a playground / park / athletic field in Morrilton, Arkansas. Working plans call for the renovation of a playground / park / athletic field.
As of November 27th, 2023 - this project will be rebid. Prospective Contractor shall purchase and install four (4) Buck Stoves, Model 74 in cabins 1, 6, 7 and 12. 1. Specifications for the Buck Stove 74 are: a. Stove Dimensions: 21-1/2" H x 27-5/8" W x 22-3/8" D b. Stove Weight: 460 lbs. c. Cubic Feet Firebox Volume: 2.15 d. Firewood Length: 22" (side to side), 16" (front to back) e. Freestanding Clearance to Combustibles: 16" (Corner)* - 23" (rear) - 24" (side) f. Pedestal to be included with each stove. g. Blower to be included with each stove. h. Flue Size: 6" i. Hearth Pad Size: 50" W x 54" D 34"W x 48"D j. Heat Capacity: 1500-2600 sq. ft. D. Prospective Contractor shall purchase and install two (2) Buck Stoves, Model 21 in cabins 8 and cabin 9. 1. Specifications for the Buck Stove 21 are: a. Stove Dimensions: 20-1/4" H x 22" W x 18-1/8" D b. Stove Weight: 317 lbs. c. Cubic Feet Firebox Volume: 1.6 d. Firewood Length: 11" front to back e. Pedestal to be included with each stove. f. Blower to be included with each stove. g. Flue Size: 6" h. Hearth Pad Size: 33" W x 40" D i. Heat Capacity: 800 - 1,800 square feet E. Prospective contractor shall provide the following for each cabin: 1. Cabin 1 a. Prospective contractor shall reline cabin 1 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 1 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 1 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 2. Cabin 6 a. Prospective contractor shall reline cabin 6 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 6 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. 3. Cabin 7 a. Prospective contractor shall reline cabin 7 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 7 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 7 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 4. Cabin 8 a. Prospective contractor shall reline cabin 8 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 21. d. Prospective contractor shall insulate cabin 8 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 8 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 5. Cabin 9 a. Prospective contractor shall reline cabin 9 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 21. d. Prospective contractor shall insulate cabin 9 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 9 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 6. Cabin 12 a. Prospective contractor shall reline cabin 12 with 9" round, stainless steel rigid liner pipe. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 1 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney.
Final Planning
Playgrounds / Parks / Athletic Fields
$19,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 18, 2023
December 27, 2023
1285 Petit Jean Mountain Rd, Morrilton, AR
Related To This Project
Morrilton, AR
--
Morrilton, AR
--
Morrilton, AR
Bid Date: Dec 14 2023
Morrilton, AR
Bid Date: Dec 19 2023
Morrilton, AR
Bid Date: Jan 23 2024
Morrilton, AR
Bid Date: Jan 25 2024
Morrilton, AR
Bid Date: Feb 15 2024
Morrilton, AR
Bid Date: Mar 19 2024
Morrilton, AR
Bid Date: Oct 05 2021
Morrilton, AR
Bid Date: Aug 08 2023
Morrilton, AR
Bid Date: Apr 19 2023
Morrilton, AR
Bid Date: Apr 20 2023
Morrilton, AR
Bid Date: Feb 16 2023
Morrilton, AR
Bid Date: Aug 12 2021
Morrilton, AR
Bid Date: Sep 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.