BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Morrilton, Arkansas. Working plans call for the renovation of a playground / park / athletic field.

As of November 27th, 2023 - this project will be rebid. Prospective Contractor shall purchase and install four (4) Buck Stoves, Model 74 in cabins 1, 6, 7 and 12. 1. Specifications for the Buck Stove 74 are: a. Stove Dimensions: 21-1/2" H x 27-5/8" W x 22-3/8" D b. Stove Weight: 460 lbs. c. Cubic Feet Firebox Volume: 2.15 d. Firewood Length: 22" (side to side), 16" (front to back) e. Freestanding Clearance to Combustibles: 16" (Corner)* - 23" (rear) - 24" (side) f. Pedestal to be included with each stove. g. Blower to be included with each stove. h. Flue Size: 6" i. Hearth Pad Size: 50" W x 54" D 34"W x 48"D j. Heat Capacity: 1500-2600 sq. ft. D. Prospective Contractor shall purchase and install two (2) Buck Stoves, Model 21 in cabins 8 and cabin 9. 1. Specifications for the Buck Stove 21 are: a. Stove Dimensions: 20-1/4" H x 22" W x 18-1/8" D b. Stove Weight: 317 lbs. c. Cubic Feet Firebox Volume: 1.6 d. Firewood Length: 11" front to back e. Pedestal to be included with each stove. f. Blower to be included with each stove. g. Flue Size: 6" h. Hearth Pad Size: 33" W x 40" D i. Heat Capacity: 800 - 1,800 square feet E. Prospective contractor shall provide the following for each cabin: 1. Cabin 1 a. Prospective contractor shall reline cabin 1 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 1 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 1 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 2. Cabin 6 a. Prospective contractor shall reline cabin 6 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 6 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. 3. Cabin 7 a. Prospective contractor shall reline cabin 7 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 7 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 7 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 4. Cabin 8 a. Prospective contractor shall reline cabin 8 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 21. d. Prospective contractor shall insulate cabin 8 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 8 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 5. Cabin 9 a. Prospective contractor shall reline cabin 9 using 304 stainless steel, 6" round flex pipes. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 21. d. Prospective contractor shall insulate cabin 9 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney. h. Cabin 9 originally had a cook stove on the kitchen side of the chimney. Prospective contractor shall be responsible to ensure the hole is patched to meet code. 6. Cabin 12 a. Prospective contractor shall reline cabin 12 with 9" round, stainless steel rigid liner pipe. b. Prospective contractor shall remove dangerous levels of creosote and soot from the inside of the unlined chimney structures via chemical treatment prior to installing a new wood stove insert and liner. c. Prospective contractor shall install Buck Stove Model 74. d. Prospective contractor shall insulate cabin 1 with foil faced, ceramic wool blankets directly connected to the Buck Stove. e. Prospective contractor shall add a new chimney cap. f. Prospective contractor shall waterproof the chimney including the tuck point, flashing repair and water repellant. g. Prospective contractor shall apply chimney saver weatherproofing to all exterior surfaces of the chimney.

Final Planning

Playgrounds / Parks / Athletic Fields

$19,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
18
Bidding Soon
250
All Active Projects
112
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2023

December 27, 2023

img_map_placeholder

1285 Petit Jean Mountain Rd, Morrilton, AR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.