BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 3, 2024 at 8:00 PM

Updated July 5, 2024

Remodeling of an educational facility in Covina, California. Completed plans call for the remodel of a educational facility.

Scope of Work: Construction of new swimming pool and deck to include a new 35-meter x 25-meter pool, lighting, site fencing, concrete pool deck, scoreboard, pool Building R, shade structures, existing pool Building R1 modernization, and associated site work for path of travel improvements. The District reserves the right to reject any or all proposals, to accept or reject any one or more items of a proposal, or to waive any irregularities or informalities in the proposals. Question Deadline 10/25/2023 at 4:30 PM PT Questions regarding this RFP must be directed to both Robin Harbert and Melinda Pure at the Email: rharbert@c-vusd.org and melinda@ehanda.com Description of Project: All construction and related services, labor and materials required for the demolition of existing pool and associated buildings with remodel of an existing building for equipment, construction of a new building, new pool and deck on the existing campus at Covina High School, 463 S. Hollenbeck Ave., Covina, California, 91723 as per the detailed description below. Covina High School Pool Replacement Project Summary Scope of Work The Covina High School Pool Project replaces the existing pool and associated pool equipment. The new concrete pool (Rim Flow style gutter) is 35 meters long (115'-0") by 25 Yd (75'-1") feet wide. Other structures/components included in this project are as follows: 1. Aluminum bleacher seating for 400 spectators with integral shade structure. 2. A new aquatic building housing restrooms, storage room, outdoor showers, concession space, and office. The building will be constructed using concrete masonry units, metal studs for furring and interior framing, structural steel roof framing, metal roof deck, and single ply roofing. Outdoor showers will be part of the new building and will be constructed of concrete masonry units, structural steel, and porcelain ceramic tile. 3. A renovated pool equipment building housing pool filtration, heating, and sanitizing equipment. 4. 6-inch-thick reinforced concrete pool deck. 5. 6 pole mounted LED pool lighting. 6. 6-foot-high galvanized ornamental iron fencing and gates. 7. Miscellaneous concrete and asphalt paving flatwork/site work. 8. All associated pool timing system and freestanding scoreboard structure. 9. Subgrade reinforced concrete surge chamber. 10. Rerouting and upgrade of affected low voltage cabling currently mounted on existing walkway shelters 11. All associated subgrade utilities and patching of existing ornamental plaza paving. 12. All associated selective demolition. 13. Earthwork. Project DSA Status: The project was approved by DSA, A# 03-122700

Under Construction

Educational

$740,000.00

Public - City

Remodeling

104

8

4

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
524
Active Projects
248
Bidding Soon
3,766
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2024

July 1, 2024

Project location map

463 S Hollenbeck Ave, Covina, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.