Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a fire / police facility in South Charleston, West Virginia. Completed plans call for the renovation of a fire / police facility.
As of January 09. 2024, this project has not yet been awarded. A timeline for award has not yet been established. **As of December 1, 2023 this project has not yet been awarded. A timeline for award has not yet been established.** State Police Headquarters Roof Replacement Project. Question Deadline 10/26/2023 at 2:00 PM ET Submit questions: Philip.K.Farley@wv.gov (Email is the preferred method.) 725 Jefferson Rd, South Charleston, WV 25309 Fax: (304) 957-7622 B. Summary of the project: 1. The building has an existing rock ballast, EPDM rubber membrane roof systems. 2. On the roof, it is not limited to, there are existing roof top units, condensing units, makeup air units, heating units, exhaust fans, vent pipes, natural gas pipes, electrical conduit, roof drains, boiler vents, roof hatches, chimney, etc. 3. The contractor must remove the existing rock ballast from all roofing areas. The contractor must haul the rock ballast from the site and is responsible for disposing of. 4. The contractor must remove the existing metal roof edging and fascia and replace with new. Color will be selected after the contract has been awarded through the submittal process. 5. The contractor must remove the existing parapet coping and replace with new. Color will be selected after the contract has been awarded through the submittal process 6. The contractor must only remove the amount of roofing that can be replaced back the same day. Contractor is responsible for securing all roof areas during construction. Contractor will be responsible for any damages caused from water leaks in any areas that are not watertight secured. 7. Metal desk areas: a. Remove existing roof system down to expose the deck. Replace all damaged or deteriorated deck approved by the owner using the square foot price submitted on the bid form. 8. Wood blocking: a. Replace any deteriorated wood blocking approved by the owner using the lineal foot price submitted on the bid form. Adding to the wood nailer to accommodate the height of the new insulation shall be the responsibility of the contractor. 9. Insulation: a. Attach new insulation to the thickness, slope per foot, slope per foot at the crickets, and mile per hour wind speed warranty stated in the specifications in the project manual and contract drawings. 10. Membrane roofing material: a. Contractor must install as per stated in specifications in the project manual and contract drawings. 11. Edging and fascia system: a. All edging, and fascia systems shall be fabricated per stated in the specifications in the project manual and contract drawings. Color shall be selected by the owner from a standard color chart. Metal system shall be covered in the total system warranty. 13. Gutters, down-spouts, through wall scuppers, and receiver heads: a. All gutters, down-spouts, through wall scuppers, and receiver heads will be fabricated per stated in the specifications in the project manual and contract drawings. The size and profile will match the existing with the color selected by the owner from the standard color chart. (If applicable.) b. Install gutter and downspouts matching size and profile of existing. Drainage system shall be fabricated per stated in the specifications in the project manual and contract drawings. (If applicable.) 14. Rubber mats: a. Contractor must install new rubber mats around all four sides of the roof top units (RTU), and the roof hatch. 15. Roof ladders: a. Contractor must verify that all roof ladders are fastened and secured to the wall. (If applicable.) 16. Rubber boots: a. Contractor must replace all rubber boots. This includes but not limited to around pipes, conduit, and wires. 17. Roof drain covers: a. If any roof drain covers are removed, contractor must replace with new if they are damaged during removal. 18. All the roof insulation must be replaced with new. 19. If the contractor must raise any of the rooftop units, natural gas pipes, etc. due to the new insulation height, the contractor must figure into their bid amount. A change order will not be issued for the previously stated work. 21. All wood areas on the top of the parapet must be completely covered with the new rubber membrane roofing system. 22. All new electrical work for the project must be preplanned and installed the same day. If the new electrical work cannot be installed the same day, the contractor must notify the building owner prior to the existing electrical be removed to see if that is acceptable.
Bid Results
Fire / Police
$655,746.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 13, 2023
December 13, 2023
725 Jefferson Rd, South Charleston, WV
Related To This Project
South Charleston, WV
Bid Date: Oct 17 2023
South Charleston, WV
Bid Date: Feb 01 2024
South Charleston, WV
Bid Date: Apr 09 2024
South Charleston, WV
--
South Charleston, WV
Bid Date: May 28 2024
South Charleston, WV
Bid Date: Jul 10 2024
South Charleston, WV
--
South Charleston, WV
Bid Date: Aug 15 2024
South Charleston, WV
Bid Date: Oct 17 2023
South Charleston, WV
Bid Date: Oct 12 2023
South Charleston, WV
--
South Charleston, WV
Bid Date: Mar 25 2023
South Charleston, WV
Bid Date: Feb 22 2023
South Charleston, WV
Bid Date: Jan 17 2023
South Charleston, WV
Bid Date: Mar 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.