BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 16, 2024 at 8:00 PM

Updated December 11, 2025

Site work, paving, outdoor lighting and renovation of a mixed-use development in Albuquerque, New Mexico. Completed plans call for the renovation of a 5,265-square-foot laboratory facility; for site work for a road / highway; for paving for a road / highway; water / sewer project; for outdoor lighting for a road / highway; and sidewalk / parking lot.

Soliciation and Amendment No. 0001 for; W912PP24B0007 DESIGN BID BUILD FY 23 CONSTRUCT INTEGRATION LAB (REVIL), KIRTLAND AIR FORCE BASE, BERNALILLO COUNTY, NEW MEXICO Magnitude of Construction is between $5,000,000.00 - $10,000,000.00. If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,356.00 for each calendar day of delay until the work is completed or accepted. If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Laboratories

$10,385,454.00

Public - Federal

Outdoor Lighting, Paving, Renovation, Site Work

236

44

6

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
22
Bidding Soon
327
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 29, 2024

March 11, 2024

Project location map

2000 Wyoming Blvd SE, Albuquerque, NM


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.