BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Victorville, California. Completed plans call for site work for a sidewalk / parking lot; and educational facility.

Landscape slope on 6th street A Payment Bond for contracts over $25,000 and a Performance Bond for all contracts will be required prior to commencement of work. These bonds shall be in the amounts and form called for in the Contract Documents This project is anticipated to start on approximately December 18, 2023 [date] and is anticipated to have a duration of 60 calendar days for completion. consisting of providing materials and labor for the installation of approximately 41,000 sq. ft. of colored stamped concrete and approximately 11,000 sq. ft. of synthetic grass. This is a prevailing wage project. The following is a description of the scope of work to be completed at Victor Valley High School.: 1. Contractor shall remove existing concrete block from area where stamped concrete and synthetic grass will be installed. 2. Contractor shall smooth and tamper soil to prepare area for stamped concrete and synthetic grass. 3. The contractor shall provide and install approximately 41,000 sq. ft. of beige colored stamped concrete. The concrete shall be a minimum of 4" thick and have #3 rebar on 2' centers. (Contractor is responsible for measuring area to determine exact amount of material needed). 4. The contractor shall provide and install approximately 11,000 sq. ft. of synthetic grass. (Contractor is responsible for measuring area to determine exact amount of materials needed). 5. The contractor shall install 25' letters saying "VVHS". These letters shall be raised 6" from stamped concrete on bottom of letter and 24" from stamped concrete on the top of the letter. 6. Contractor shall supply and plant 14 trees of District's choice with irrigation installed. 7. The contractor shall ensure all work is being completed safely, professionally and timely. 8. Contractor will ensure all federal, state, county, and local laws, regulations, and codes are being followed. 9. Contractor shall clean job site to pre-construction conditions. 10. Contractor shall include a $50,000.00 allowance in the bid. 11. Contractor shall include a copy of the signed scope of work with their bid. 12. Contractor shall be required to provide a performance and payment bond if awarded contract. 13. Contractor shall be required to provide a prequalification packet 10 days prior to bid opening.

Award

Educational

$1,763,742.00

Public - City

Site Work

3

3

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
100
Bidding Soon
2,135
All Active Projects
966
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2023

December 18, 2023

img_map_placeholder

16500 Mojave Dr, Victorville, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.