Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 26, 2025 at 8:00 PM
Updated June 27, 2025
Site work and paving for a bridge / tunnel in San Juan Capistrano, California. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
As of June 26, 2025, this project is in the preliminary engineering and environmental review stage. A timeline for construction has not yet been established. *Previous solicitation listed below for reference:* ENVIRONMENTAL AND ENGINEERING DESIGN SERVICES OF THE LA NOVIA AVENUE BRIDGE REPLACEMENT OVER SAN JUAN CREEK (PDF) - Proposals due Wednesday, December 4, 2024, by 4:00 PM. ................ Per the owner, as of November 20, 2024, a consultant has been selected for the study. The method of Contractor Selection has not been Determined at this time.
Design
Bridges / Tunnels
$2,000,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
19
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
