EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 29, 2023 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Pittston Twp, Pennsylvania. Completed plans call for the renovation of a library; and religious / funeral development.

The City of Pittston, 35 Broad Street, Pittston, PA 18640, is soliciting bids for Partial Roofing and HVAC Replacement at Pittston Memorial Library, 45 Broad Street, Pittston, PA 18640 and Roofing Investigation and Repairs at the Former Presbyterian Church, 14 Broad Street, Pittston, PA 18640. Bids will be received for the following prime contract(s): Contract No. 1: General Construction Contract No. 2: Mechanical Construction Bids received after that time will not be accepted and the name and Prime Contract Number bid on, name of bidder and date and time of bid opening, in order to guard against premature opening of the bid. Facsimile bids will not be accepted or considered. Complete digital project bidding documents are available Electronically for $25.00 Cut-off date for issuing Bidding and Contract Documents shall be November 2, 2023 at 4:00 pm. All bids shall remain firm for sixty (60) days following opening of bids . Each contractor and each sub-contractor shall be licensed in the community where the work will occur. The Contract will be written to retain 10% for each request for . When the Contract is 50% completed, no further retainage will be withheld, but no retainage previously withheld will be returned to the Contractor. All retainage withheld during the first 50% of the work will be held until completion. However, the Architect must approve the Application for . The Contractor must be making satisfactory progress and there must be no specific cause for greater withholding. The Owner-Contractor Agreement will be the Standard Form of Agreement Between Owner and Contractor, AIA Document A101, 2017 edition. The Owner requires that all Bids shall comply with the bidding requirements specified in the Instructions to Bidders. The Owner may, at its discretion waive informalities in Bids, but is not obligated to do so, nor does it represent that it will do so. The Owner also reserves the right to reject any and all Bids. Under no circumstances will the Owner waive any informality which, by such waiver, would give one Bidder a substantial advantage or benefit not enjoyed by all other Bidders. Bonding companies for and Bonds must be listed in the U.S. Treasury Circular No. 570. A Bid Bond made payable to the City of Pittston in the amount of 10% of each Base Bid shall accompany each bid, executed by the Contractor and a surety company licensed to do business in the Commonwealth of Pennsylvania, as a guarantee that, if the bid is accepted, the bidder shall execute the proposed contract and shall furnish and pay for a and in the amount of 100% of the Contract Price as security for the of the Contract and of all costs thereof, upon execution of Contract. If, after fifteen (15) days the bidder shall fail to execute said Contract and , the Bid shall be forfeited to the Owner as liquidate damages. The Bid of all bidders, except the three low bidders, will be returned within ten (10) days after the opening of the bids. The Bid of the three low bidders for each prime contract will be returned within three days after the executed Contracts and required bonds have been approved by the Owner. The successful Bidder will be required to file a Stipulation Against Mechanics Liens prior to commencing work. Contact the Owners Representative listed in the Project Manual. The Bidding Documents and Forms of Proposal may be examined at the following during regular business hours: Quad Three Group, Inc., 37 North Washington Street, Wilkes-Barre, Pennsylvania 18701, telephone 570-829-4200, facsimile 570-829-3732. Editorial of NEPCA, 363 Laurel Street, Lower Level, Pittston, PA 18640, telephone 570-655-5905, facsimile 570-655-5960. Bid Result:- 1. General Construction: Hadley Construction, Inc. $258,000.00 2. Mechanical Construction: Troy Mechanical, Inc. $107,560.00

Award

Library

$365,560.00

Public - City

Renovation

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Work Restrictions, Access to Site, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning, Starting and Adjusting
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Site-Cast Concrete, Tilt-Up Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Glass Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Decking, Sheathing, Shop-Fabricated Structural Wood, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Firestopping, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Flooring, Wood Flooring, Terrazzo Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Screening Devices
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
110
Bidding Soon
1,445
All Active Projects
651
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2023

November 15, 2023

img_map_placeholder

Multiple Locations, Pittston Twp, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Partial Roofing and HVAC Replacement at Pittston Memorial Library and Roofing Investigation and Repairs at the Former Presbyterian Church

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.