BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2024 at 7:00 PM

Updated February 14, 2024

Site work and paving for a road / highway in Ceresco, Nebraska. Working plans call for site work for a road / highway; and for paving for a road / highway.

As of 2/13/2024, this project was tabled to the 2024/2025 budget. A. Sidewalk work may be required at some sites to bring curb ramps up to ADA standards or due to proximity to street repair work. Contractor shall review each site with the Engineer/Owner prior to removals to determine limits of sidewalk work, if needed. B. At all locations, once pavement is removed for a patch, it shall be replaced within 3 calendar days and open to traffic within 10 calendar days of when it was first removed. Concrete shall cure a minimum of 7 calendar days prior to opening. At 7 days, the minimum strength shall be at least 85% of the required 28 day strength top place the street back into service. C. Project Site(s) and preliminary sizes. Work will be completed in order provided based on available funds. The work is generally described as follows: sealing of existing joints and cracks in the Village Streets. The village has been split into thirds for sealing of streets over three consecutive years. Proposals will include contractor qualifications and unit prices for street sealing work. All Proposals for said construction work must be made on blanks furnished by the City and must be accompanied by a Bid Deposit of $500. Bid Security to be made payable to the Treasurer of the Village of Ceresco as liquidated damages in case the bid is accepted and the bidder neglects or refuses, to enter into contract and furnish bond in accordance herewith. The Owner reserves the right to waive informalities and irregularities and to make awards on bids which furnish the materials and construction that will, in their opinion serve the best interests of the Owner, and also reserves the right to reject any and/or all bids.

Final Planning

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
92
Bidding Soon
909
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2023

August 26, 2024

Project location map

Ceresco Street, Ceresco, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.