BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

Hamilton ES - Split System Gym Cooling - ONLY PREQUALIFIED POOL Various Trades PLA for work over 25K. Questions Due Date: Oct 10th 2023, 7:00 PM CDT. School will receive a supplementary cooling system to serve their Gym/Auditorium located on the 3rd floor of the original building. The system shall consist of a number of 2-ton capacity split system fan coil units (FC) located high on the wall within swing-open cage enclosures for safety. The associated Condensing Units (CU) will be located on the adjacent low roof and shall be either 1-to-1 or combined into no more than 3 FC to 1 CU arrangement. The units will be controlled by remote mounted thermostats within locked safety enclosures. Refrigerant piping will be run along the top of the wall below the ceiling and include all required valving, insulation, supports, heavy duty PVC jacket and wall penetrations from the space thru the exterior wall to the exterior CU locations on the lower roof. Fan Coil units shall be located high along both the North and South walls (3 EA), equally spaced. 3 cassette type units are to places within the ceiling space above the stage. 1 wall hung units is to be placed in the rear area of the stage, with the exterior wall and windows. Variations may be made to avoid existing elements within space. Support structures may be required to facilitate proper, level mounting of units. All refrigerant piping to include insulation, PVC jacket and be properly anchored to the wall and ceiling elements. Electrical and pipe penetrations to be made with pipe portal and properly sealed. Roof patching to be done by approved contractor. Environmental scope of work to be provided in separate document. A new local power panel will be added for connection of all of the supplementary cooling equipment required. This location will be determined in the field. A new breaker will be provided within the switchgear located in the Basement and run up to the new panel location. The proposal shall be submitted with the attached Bid Cover Sheet completed in its entirety. * Warranty information, when applicable, shall also be included & submitted. * All work to be performed during normal working hours. * If bid price is over $25,000 or more, bidder must be signatory to relevant union, per terms of the Various Trades Contract and Project Labor Agreement. * If bid price is over $75,000, you MUST include your MBE/WBE subs and relevant forms at time of bid.

Post-Bid

Educational

$100,000.00

Public - City

Renovation

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
94
Bidding Soon
1,872
All Active Projects
823
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2023

December 4, 2023

img_map_placeholder

1650 W Cornelia Ave, Chicago, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.