BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2024 at 7:00 PM

Updated January 17, 2025

Site work and paving for a civil project in El Dorado, Kansas. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

As of December 6, 2024 project was awarded to King Construction Company, awarded amount is $905,516.50. Said proposed improvements include the construction ofthe following work together with all work involved and indicated by the plans and specifications. Project Number BR9E3-27-5 (23) - 42' - 56' - 42' Reinforced Concrete Haunched Slab (RCSH) with a 30' roadway. This bridge is located on SW Haverhill Road, approximately 0.3 mile south of SW 70th Street. This is 6.8 miles south of El Dorado. Bid Bond 5% of proposal

Award

Bridges / Tunnels

$905,517.00

Public - County

Paving, Site Work

58

7

2

3

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
44
Bidding Soon
502
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 15, 2024

December 16, 2024

Project location map

SW Haverhill Rd, El Dorado, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.